Skip to content
SafetyCulture

Telecommunications & Media

Discover easy-to-use Telecommunication & Media templates and training courses for distribution, compliance check, and more. Use them to gain practical knowledge, streamline your work, and stay on top of industry best practices. Customize these resources to fit your needs and excel in the Telecommunication & Media industry with confidence.

1,382 results
  • NBN Fibre Pathways Inspection Checklist for MPS and MDU
    Template

    NBN Fibre Pathways Inspection Checklist for MPS and MDU

    Use this visual inspection checklist to assess NBN fibre pathways in multi premise sites and multi dwelling units. It covers lead in conduits, communications rooms, trunk pathways, and riser cupboards, including spacing, labeling, cable trays, and pathway transitions. Verify premise conduits and NTD locations, ventilation and clearances, and that conduits are strung, glued, and installed to design. Includes prompts for separation from other services, access panels, bend radii, and fire stopping arrangements. Note that this checklist does not certify practical completion.

    by Darren Jenkins, from the Community
    Downloads: 10+
    Get
  • Checklist de Venta en Campo ClaroHogar
    Template

    Checklist de Venta en Campo ClaroHogar

    Plantilla en espanol para auditar y gestionar la venta en campo de productos ClaroHogar (HFC, LTE, TFI, DTH). Incluye verificacion de cobertura de zona, presencia de supervisores y vendedores, uso de kit de ventas y uniforme, grilla de canales y paquetes 2play/3play, registro de ventas y puntos de pago. Contempla recursos de activacion como puerteo, volanteo, caravanas, megafono, modulo y toldo, con evidencia fotografica, observaciones, acuerdos y firma del supervisor.

    by Alejandro Del Río, from the Community
    Downloads: 10+
    Get
  • Cable and Fibre Telecoms Audit Checklist
    Template

    Cable and Fibre Telecoms Audit Checklist

    This NGE cable and fibre telecoms audit checklist helps supervisors and field teams assess telecom infrastructure works against expected standards. It covers inspection details, site safety and PPE, welfare, tool condition, and calibration of detection equipment. It verifies work packs, RAMS, daily risk assessments, and adherence to safe systems of work including HSG47 and CAT and Genny processes. Sections address excavation housekeeping, external cabling routes and specifications, labeling, test records, waste disposal, and back rope installation. Fibre splicing checks include labeling, heatshrinks and seals, numbering, cleanliness, cassette management, cable identification, joint securing, pit sizing, stress loops, and splice tray labeling. Use this to document compliance and close out actions on site.

    by David Parker, from the Community
    Downloads: 10+
    Get
  • DMR T3 As-Built Site Installation Checklist
    Template

    DMR T3 As-Built Site Installation Checklist

    Use this DMR Tier III as-built form to document end-to-end site installations. Record rectifier type, asset and serial numbers, battery and MCB panel details, AC mains checks, labeling and photos of power terminations. Capture RF works including repeaters, antennas, combiners, filters and cabling, plus filter tuning and radio quality checks. Log commissioning tests with GPS location, distance to tower, line-of-sight conditions and handheld signal levels. Include switch and router models, serials and quality checks, and attach required overview and site photos.

    by Irtiza Mumtaz, from the Community
    Downloads: 10+
    Get
  • FTTH Civils Build Walk-Off Checklist
    Template

    FTTH Civils Build Walk-Off Checklist

    This FTTH civils build walk-off checklist guides field teams to document site details, toby or lead-in chamber photos, MDU connection points, excavation depth along the route, upturns at the property, and all reinstatement works. Capture measurements for materials and ground types, attach additional notes, and complete sign-off to verify quality and compliance.

    by Kyle Lbranco, from the Community
    Downloads: 10+
    Get
  • Village Hotels Sky Upgrade Site Survey
    Template

    Village Hotels Sky Upgrade Site Survey

    This site survey checklist supports a Sky upgrade at Village Hotels to expand the RF distribution system with eight additional channels: four Sky Sports and four BT Sports. The upgrade specifies an 18U cabinet housing eight site-provided Sky set-top boxes, eight new modulators, and a TV for monitoring. The survey captures dish presence and location, downlead type (fibre or RF) and route, distribution type, existing launch amp and headend, cabinet location, and nearby power availability. It records current Sky boxes and channels, RF channel allocations, terrestrial TV availability and channels, TV makes/models and quantities, and includes customer sign-off acknowledging temporary channel loss during retuning.

    by Victor Demuth, from the Community
    Downloads: 10+
    Get
  • NBN HOP Photos Checklist
    Template

    NBN HOP Photos Checklist

    This NBN HOP photo checklist standardizes how telecom field teams document network sites. It guides comprehensive photo capture of antenna clusters and serials, RRUs, TMAs, GPS units and surge protection, earthing at tower and shelter, cable trays and gland windows, site access and compound, electrical and meter boxes, EME and RF hazard signage, co‑located structures, and 5G antenna details. Use it to ensure consistent, audit‑ready records for installations, decom work, and quality verification.

    by Jay Hampton, from the Community
    Downloads: 10+
    Get
  • LTE Installation Checklist V1.0
    Template

    LTE Installation Checklist V1.0

    Use this LTE installation checklist to validate indoor and outdoor work after deployment. Confirm baseband earthing and screws, correct SFP connections 65-2 to 1800 and 47-2 to 800, labeling of fiber, DC cables, and winder boxes, and capture required photos. Verify RRUs are installed to standard, earthed, and correctly cabled with separated DC and fiber runs, tightened jumpers, sector labeling, and secured cable trays. Record NOC contact and remarks to complete closeout.

    by Team Leader Ericsson, from the Community
    Downloads: 10+
    Get
  • ApfuturaUK As-Built Survey
    Template

    ApfuturaUK As-Built Survey

    Document telecom network builds with a structured as-built checklist. Capture PIA number, site title, contractor and location, chamber or lead-in status, chamber type codes such as JBF2, JBF4, JBF6, JBF10 and JRC variants, entry and exit bores, equipment location, and supporting images of open chambers, buildings and lead-ins. Use this template to standardize field data collection and maintain accurate records for network infrastructure and compliance.

    by Audit Officer, from the Community
    Downloads: 10+
    Get
  • Site Completion Record v 2.1
    Template

    Site Completion Record v 2.1

    Use this Site Completion Record template to document every step of an ICT or telecom site installation and handover. Capture site name and alpha, contractor and company details, assigned engineers, and the installation start and end timestamps. Record materials used including patch cord lengths and power cabling, log any equipment removed from site with type, serial, and asset numbers, and add job comments for context. This structured form helps teams standardize sign off, maintain accurate asset records, and streamline project closeout across network deployments and upgrades.

    by Irtiza Mumtaz, from the Community
    Downloads: 10+
    Get
  • IRS Faceplate & 4Fibre Installation Report
    Template

    IRS Faceplate & 4Fibre Installation Report

    Use this installation and test report to document IRS faceplate and 4Fibre work on site. Capture job number, site address, installer, fire stopping on both sides, photos before and after, socket installation and testing, multiroom details, cable routing, signal strength, connected devices (Freeview, Freesat, SKY, radio), dish removal, old socket blanking, issues found, and resident sign-off.

    by Nelio Goncalves, from the Community
    Downloads: 10+
    Get
  • 4th Utility CPE Installation Checklist
    Template

    4th Utility CPE Installation Checklist

    This 4th Utility CPE installation checklist helps field engineers complete and document customer premises equipment installs. Capture flat or plot and project details, CPE location, ambient light level with a supporting photo, CPE serial number with photo evidence, a photo of the installed router as left, and any extra notes. Include conducted-on and prepared-by fields and complete sign-off with engineer signature to verify installation quality and handover.

    by Andy Holland, from the Community
    Downloads: 10+
    Get
  • Telecom Exchange Site Audit
    Template

    Telecom Exchange Site Audit

    This telecom exchange site audit checklist helps teams inspect network infrastructure and setup across critical areas: switches and console server installation, correct port patching via DAC/MPO, NNI/VPN uplinks, cable management and labeling, ADSL line to console server, and photo capture of fabric switches, MGMT switch, and console. It includes OLT checks such as baffles, tidy patch leads, WDM per block with cable management, and connections to management and console ports. Power verification covers redundant DC supplies, Molex fuse panels front and rear, and orderly rack dressing. The checklist concludes with testing devices, recording router serial numbers, and reporting any site issues like power, space, heating, or noise.

    by Andre Carvalho, from the Community
    Downloads: 10+
    Get
  • HTS Approved Variation (AV) Request
    Template

    HTS Approved Variation (AV) Request

    Use this HTS Approved Variation (AV) Request form to submit claims for goodwill AV payments when unforeseen circumstances impact telecom field work. The checklist guides subcontractors through eligibility, including task types, validation with Tech Support or HSEQ, and required supporting evidence such as photos and notes. Non‑standard jobs, complaint liabilities, and rework of your own tasks are excluded. Claims must be submitted within two business days of job completion. Reasons covered include difficult cable runs, drilling internal walls, weather, tower outages, site access delays, and more, with reminders to contact Tech Support, use the travel calculator when applicable, and follow HSEQ procedures.

    by Shane Muller, from the Community
    Downloads: 10+
    Get
  • Digital Space JDW SD-WAN v8 Installation Checklist
    Template

    Digital Space JDW SD-WAN v8 Installation Checklist

    Comprehensive SD-WAN v8 installation and user acceptance testing checklist for JDW sites. Capture site details, hardware serials, remote access confirmation, and cabinet photos. Validate critical functions: card payments, customer app orders, back office web and email, hotel systems (Rezlynx, booking.com), kitchen screens, tills, customer Wi-Fi, and allergen screens. Complete non-critical UAT for WISDOM, Aztec, APOS, mySchedule, myJDW, ResourceLink, Trinity, App Manager, AMRIS, Microlise, and training via myLearning. Verify printing from back office and reception PCs, receipt printing on tills, and kitchen/bar order transmission. Submit test page photos to NOC, record Phase 2 Wi-Fi box location, attach disposal photos, and complete manager sign-off.

    by Luke Hartle, from the Community
    Downloads: 10+
    Get
  • New Site Integration checklist V1.0
    Template

    New Site Integration checklist V1.0

    This telecom site integration checklist supports field engineers and integrators during new site turn up. It covers testing external alarms, configuring EC bus and external nodes, capturing no alarm screenshots after integration, saving final 2G and 3G configurations, exporting cabinet and site scripts, and confirming successful integration across technologies. The audit section guides labeling for fiber optic, EC bus, RRU and DU power, TRM and E1 cables, documenting equipment earthing, and attaching labeled equipment photos. Use it to standardize integration, reduce errors, and ensure sites are ready for service.

    by Powertech ENGINEER, from the Community
    Downloads: 10+
    Get
  • DMR T3 As-built Checklist for Site Installations
    Template

    DMR T3 As-built Checklist for Site Installations

    Document site installation for DMR Tier III systems, including rectifier and battery setup, MCB panels, AC/DC checks, repeaters, RF components (antennas, combiners, filters), RF cabling and tuning, and radio rack mounting. Capture asset and serial numbers, label power and Ethernet cabling, follow IP diagrams, and attach required photos of racks, mains distribution, equipment rooms, towers, and site exteriors. Use quality checklists for routers and switches, confirm labeling and terminations, and record comments for each stage to deliver a complete as-built.

    by Irtiza Mumtaz, from the Community
    Downloads: 10+
    Get
  • Risk Assessment Cabling V2
    Template

    Risk Assessment Cabling V2

    Use this telecom cabling risk assessment checklist to plan and execute safer works. It helps teams review PPE such as harness, safety boots, gloves and hard hat. Address excavation activities, traffic speed limits, and work locations including busy roads, schools and country roads. Consider occupational health risks from manual handling, noise, dust and vibration. Identify confined space or work at height tasks and capture site setup photos. Protect pedestrians and vehicles and verify warning signs and road closures following Chapter 8 guidance. Check equipment like petrol generators, cabling tools and water pumps. Add control measures and photo evidence before starting.

    by Reymark Escober, from the Community
    Downloads: 10+
    Get
  • Commsite Wideband MTX Civils Pre-Start Audit
    Template

    Commsite Wideband MTX Civils Pre-Start Audit

    Use this telecom civils pre-start audit to capture mandatory job information for Commsite Wideband MTX works. Record purchase order and scope, complete Dial Before You Dig checks, attach land access notices and applicable electrical, water or gas permits, and confirm traffic management in place. Add photo evidence throughout, summarize outcomes, and obtain inspector name and signature to ensure compliance before commencing site works.

    by Jarrah Harvey, from the Community
    Downloads: 10+
    Get
  • At Our Best V1.1 - Field Engineer Audit Checklist
    Template

    At Our Best V1.1 - Field Engineer Audit Checklist

    Use this At Our Best V1.1 checklist to coach and audit field engineers across the full service journey. Review ETA process and communication, vehicle condition and telematics, IFS compliance, job timestamps and stock control, risk assessment and escalation, customer profiling, Sky Q installation and service steps, SM3 setup and updates, WiFi testing, health and safety requirements, team communication, admin, surveys, holidays, and uniform readiness.

    by Kevin Clelland, from the Community
    Downloads: 10+
    Get
  • Safety Equipment Inventory Checklist for Crews
    Template

    Safety Equipment Inventory Checklist for Crews

    This monthly safety equipment inventory checklist helps field crews verify essential items before work. It covers PPE for all crew members, welfare supplies, Chapter 8 temporary traffic management signage, gas detection equipment, sharps and spill response kits, and tools. Additional sections address overhead work equipment such as ladders, harnesses, fall arrest lanyards, and insulated gloves, plus telecom and splicing tools, light meters, and drill kits. A van welfare check ensures vehicle cleanliness, tidiness, reflectors, and shelving integrity. Use this template to standardize inspections, replace missing or expired gear, and maintain compliance and readiness.

    by GFT ADMIN, from the Community
    Downloads: 10+
    Get
  • Site Survey: Transformation and CustomNet
    Template

    Site Survey: Transformation and CustomNet

    This checklist supports ICT site surveys for network transformation and CustomNet deployments. Capture site details, access and inductions, MDF and NBN locations, and 4G signal testing. Document communications rooms, environmental controls, racks, PDUs, fibre and copper backbones, carriers, and power distribution. Record CustomNet phones and other OT services such as CCTV, EFTPOS, alarms, and PA. Plan WiFi and WAP installations, distances, drilling, and lifts. Conclude with onsite survey notes and a risk assessment.

    by eng1 Allstar, from the Community
    Downloads: 10+
    Get
  • Odeon Cinemas Satellite Site Audit Form
    Template

    Odeon Cinemas Satellite Site Audit Form

    This Odeon Cinemas Site Audit Form is designed for auditing satellite TV reception and broadcast systems at cinema locations. It captures site details, reception levels at the receiver, and signal quality. Inspectors record dish location and access, take photos of the dish and receiver position, and note the mount type and any ballast or bolt checks. The form covers dish alignment, LNB type and skew, waterproofing of LNB and cable connections, satellite cable type, routing and ties, and connector types and quality. It also provides space for remedial work notes, general comments, additional photos such as receiver or cable routes, and engineer sign-off to ensure consistent maintenance and compliance across sites.

    by iAuditor SCCI Alphatrack Ltd, from the Community
    Downloads: 10+
    Get
  • SML Fibre Daily Report
    Template

    SML Fibre Daily Report

    Capture daily fiber installation activities with this structured report. Log client, job packs, date, location, and team members. Record work types such as TRR, subduct, cable installation, splicing, and A55 blockage clearing. Enter distances roped, subducted, and cabled, plus cable types 48f, 144f, 288f and lengths installed. Track support kits, joints ready for splicing, and progress across multiple sections. Confirm daily risk assessment and finish with a signature before leaving site.

    by SML Office, from the Community
    Downloads: 10+
    Get