NGA Last Step Fibre Scoping Form
by Tshifhiwa Netshidzivhani, from the Community
This NGA Last Step Fibre Scoping Form supports Ultra-Fast Broadband (UFB) builds by capturing all details needed to plan Last Step Fibre (LSF) installations. Use it to log S/O number, address, commit date, and site contacts, define network type (air blown fibre, fixed fibre haul, aerial), and note skills and equipment required, including trenching, drilling, concrete cutting, and blowing distances. Record traffic management needs, obstructions, and customer consents for works inside and outside the property, plus agreed ONT location and job instructions. It also covers health, safety, and environmental checks, includes space for labelled photos, and references Chorus End User Terms for UFB installations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
