Use this NGA Fibre Ready Scoping Form Version 5 to scope fibre jobs from desktop to site. Capture build completion status, work type such as aerial, haul, surface mount, trench or drill, and network type including air blown fibre, fixed fibre and aerial. Record specific skill needs, distances, traffic management and other requirements. Collect customer details, job instructions and labelled photos. Note health, safety and environmental considerations and required consents for right of way, multi dwelling units and heritage sites. Document network assets such as FAT and cabinet locations and internal preferences for ONT and RGW. Includes end user consent and technician sign off for Ultra Fast Broadband provisioning.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.