Use this NGA Scoping Form to plan and document fiber network work for UFB provisioning. Capture the service order, address, appointment time, and work type such as aerial, haul, surface mount, trenching, drilling, or hard surface trenching. Record network type (air blown fiber, fixed fiber haul, or aerial), distances, job instructions, Netmap or lay plans, photos, and a detailed scope. Log health, safety, and environmental issues, approvals (e.g., Chorus), TMP requirements, arborist needs, gas detection, obstructions, and additional notes.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
