This NGA Fibre Ready Scoping Form (Version 5) supports Ultra-Fast Broadband provisioning. It captures job details (S/O number, address, commit date), scope type, and work type (aerial, haul, surface mount, trenching, drilling). Record network type, approvals, required skills, drill and trench distances, traffic management plans, and other requirements. Collect customer details, job instructions, labelled photos, and identify health, safety and environmental issues. Document consents (ROW, MDU, heritage), network elements (FAT, cabinet, ETP distance), internal materials, preferred ONT and RGW locations, and notes. Includes end user consent aligned with Chorus terms and guidance to use the Last Step Fibre template when applicable. Email completed form to the UFB provisioning mailbox.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
