Categories
Telecommunications & Media
Discover easy-to-use Telecommunication & Media templates and training courses for distribution, compliance check, and more. Use them to gain practical knowledge, streamline your work, and stay on top of industry best practices. Customize these resources to fit your needs and excel in the Telecommunication & Media industry with confidence.
- Template
Ezentis - Auditoria de Segurança
Checklist de auditoria de segurança voltada a operações de telecomunicações (FTTH, móvel e HFC). Abrange documentação legal, acesso e sinalização do local, andaimes e escadas, trabalhos em altura, atividades em coberturas, avaliação de campos eletromagnéticos com dosímetro, escavações, máquinas e equipamentos, substâncias perigosas, riscos elétricos, movimentação e elevação de cargas, EPI e EPC, primeiros socorros, bem como boas práticas ambientais. Inclui seções para observações, identificação de intervenientes e registro de não conformidades com classificação de gravidade e prazos de resolução.
by Auditoria Drivewiz, from the CommunityDownloads: 10+Get - Template
Telecom Duct Blockage Survey Checklist
The A55 field survey checklist supports telecom duct and chamber works, including single or multiple blockages, new track, desilting, pole and buried chambers, and seized frame and cover fixes. Capture surface type, address, coordinates, traffic management, survey requirements, bore depth and fullness, cable counts and types, duct type, JUF and JRC box types, and distances between boxes and blockages. Add APX annotations and required photos of chambers, duct mouths, markers, and surroundings to document locations and plan desilting, gully suck, or new track remedial works.
by SML Office, from the CommunityDownloads: 10+Get - Template
Site Compliance Audit Checklist
Use this site compliance audit checklist to assess civil and fiber works sites. Verify on-site risk assessments, pre-start checks, gang and COSHH packs, current utility drawings, and service identification and trial holes. Confirm worker qualifications, Cat and Genny condition, vehicle safety, spill kits, first aid, and correct PPE. Review signage, permit boards, cones, barriers, walkways, ramps, and resident access. Check traffic management setup, housekeeping, dust suppression, and protection of drains. Conclude with findings and capture signatures and date.
by Tracy Peart, from the CommunityDownloads: 10+Get - Template
Data JSA V1.1
This Data Job Safety Analysis template helps technicians and contractors working on fibre, copper, and data cabling sites assess risks and define controls. It covers site induction and permits, EWP checks, electrical separation, work at heights, excavation and traffic controls, PPE, power tools, lighting and visibility, dust management, and stakeholder coordination. Includes hazard identification prompts, control guidance, and a sign-on confirmation section.
by Ryan White, from the CommunityDownloads: 10+Get - Template
FTTH Service Call Report Template SCCI
This FTTH service call report template helps telecom field teams capture site and job details, reported faults, and a detailed account of engineer findings. Record corrective actions taken, attach photos before and after, and confirm service status. Include evidence of IOLM and power meter test results, add comments, and complete sign off. Designed for fiber to the home service and maintenance workflows.
by Andy Holland, from the CommunityDownloads: 10+Get - Template
G-Network Toby Check
Use this G-Network Toby Check to capture key details for fiber installation or maintenance. Record the DP and toby box locations, confirm presence of incoming fibers, note required fiber length and counts from toby to DP, and specify job pack requirements. Add a photo of the open toby box and complete engineer sign-off to maintain consistent, auditable field documentation.
by Nelio Goncalves, from the CommunityDownloads: 10+Get - Template
Telecom Pit Installation Audit Checklist
This telecom pit installation audit checklist helps field teams verify civil and network infrastructure works for NBN and Telstra projects. Confirm correct pit size and location, safe distance from roadways and corners, and that the lid type and ownership markings are accurate. Check reinstatement quality with compacted soil and clean site conditions. Inspect conduit entries and ensure cuts and holes are sealed with approved repair methods. Capture photos of the closed lid, pit interior, and ID label. Verify a durable identification tag lists project and contractor details, then record the audit outcome.
by WAYNE BUCKLEY, from the CommunityDownloads: 10+Get - Template
Hodnocení projektu a instalace AV systémů
Tato šablona slouží k systematickému hodnocení projektu a instalace audiovizuálních systémů. Pokrývá přípravu (PD2, plán instalace, projektovou dokumentaci), BOZP a staveništní dokumenty, kvalitu realizace u klíčových prvků jako projektory, projekční plochy, displeje, kamery, interaktivní tabule, řídicí systémy, audio, teleprezence a digital signage. Dále hodnotí racky, kabeláž a silnoproud, firemní standardy na pracovišti, zpětnou vazbu klienta a dokumentaci skutečného stavu (PD3). Obsahuje sekce pro fotodokumentaci a poznámky projektového manažera i servisního předání.
by Tomas Volf, from the CommunityDownloads: 10+Get - Template
FW Block Cabling As Built
This FW Block Cabling As Built checklist helps teams document fiber block cabling installations for handover and compliance. Capture project and block details, record splice enclosure information, select splitter configurations 1:8, 2:8, 3:8, 1:32, 2:32, 3:32, and note PBO and splitter locations internal, external, or mixed. Attach post-install photos covering enclosures, fire stopping, hatches, feed cables, block cabling, fire ties, and coils. Use the build commentary to summarize works completed and ensure a complete as-built record aligned with HSEQ requirements.
by Barry Glandfield, from the CommunityDownloads: 10+Get - Template
Fiber Optic Installation Closeout Package
Use this closeout package to document telecom fiber installation projects from start to finish. Capture facility, trench and bore, hand hole, and fiber installation photos before, during, and after work. Record as builts, fiber reels and numbers, fiber and conduit footage, hand hole counts, tracing wire, and NEMA equipment. Include job details such as job number, site location, customer number, crew, and scope of work. Attach photos of located utilities and provide final actions needed from the customer to support client sign off and turnover.
by Alexis Dube, from the CommunityDownloads: 10+Get - Template
Audio Visual System Report and Commissioning Checklist
This Audio Visual System report and commissioning checklist helps technicians and integrators verify and document AV installations. It guides pre-checks, equipment power and network configuration, wallplates and cabling, audio performance, microphones and hearing augmentation, displays and projectors, cameras and video conferencing, control systems, digital signage, EWIS connectivity, defects, and final sign-off, ensuring reliable, user-ready rooms.
by Asha Lewis, from the CommunityDownloads: 10+Get - Template
Transfield Provisioning Scoper QA Template
This telecom field quality assurance checklist supports fiber provisioning audits from FDH to premises. It covers FDH external and internal condition, splitter and port use, pigtail routing and labeling, tray labeling and splice quality, ABF routing and identification, duct and tube selection with gas seals, and overall compliance. It reviews civil reinstatement and dropoff condition, ETP fitment and internals, external conduit and wiring, and site tidiness. Internal checks include fiber run standards, ITP or CTB termination, ONT and router presentation, third party work, and adherence to scope, with space for customer feedback and summary notes.
by Jared Hunt, from the CommunityDownloads: 10+Get - Template
Stonegate Sky Q Site Preparation Survey
This site preparation survey supports Stonegate venues upgrading to Sky Q. It guides engineers through assessing satellite dish location and LNB compatibility, access equipment needs, and existing feeds. Indoors, it captures Sky box locations and quantities, card numbers, available power and sockets, rack space for Sky Q, network switches, dSCR multiswitches, and DACs. Networking and video distribution are profiled across RF, DVB-T modulators, Wyrestorm NHD or matrices, Just Add Power, HDAnywhere, and Pulse8. The survey also covers AV rack and EPOS comms cabinet locations, cabling routes, trunking, patch panels, PDU availability, and counts of TVs and projectors, with space for photos and notable site constraints.
by Mark Dorney, from the CommunityDownloads: 10+Get - Template
Fibre Patching, Splicing and Testing Checklist
This field inspection checklist supports quality assurance for fibre and copper work across patching, splicing and testing. It verifies correct port allocation, labelling and patch lead selection, assesses joint enclosures, ODFs and fibre distribution boxes for cable length, support, routing, storage slack and tray integrity, and checks cleanliness and site safety. It guides documentation of defects and rectification, and confirms test equipment calibration plus insertion loss and OTDR results against the optical budget and specification.
by Pmurugiah User, from the CommunityDownloads: 10+Get - Template
Check List de Televentas para Claro Hogar
Plantilla de control para equipos de televentas de Claro Hogar. Incluye verificación de estructura de plataforma y equipamiento de asesores, recursos básicos como monitoreo activo, almacenamiento interno y speech vigente; control de cumplimiento de lista Gracias No Insista de Indecopi y sistemas de bloqueo; formación y control con cronograma de capacitaciones, envío de altas, seguimiento de avance por asesor y espacio para entrenamiento. Registra evidencias con fotos, observaciones, acuerdos y calificación para asegurar calidad y estandarización en el call center.
by Raul Marcelo, from the CommunityDownloads: 10+Get - Template
VTC Conference Room Installation QC Checklist
Use this VTC conference room installation technician QC checklist to verify physical inventory, rack wiring standards, cable labeling and strain relief, speaker and display mounting, microphones and cameras, field wiring, and power distribution. Includes sections for documentation, cleanup, manuals and remotes, and addressing punch-list items to the project manager.
by Herbert Keeler, from the CommunityDownloads: 10+Get - Template
Greenfield PPM Visit Checklist 2021
Conduct comprehensive planned preventive maintenance for Greenfield telecom sites. This checklist guides inspections across access routes, trees and fall risks, site compound condition, meter and electrical cabinets, operator cabinets, lightning protection, and structural integrity. Capture photos, record padlock codes, verify certificates for lightning protection and fall arrest, review floodlight installations where applicable, and check health and safety signage. Use the template to document findings, flag defects, and complete digital sign off for compliant maintenance reporting.
by Ross Morrison, from the CommunityDownloads: 10+Get - Template
Azured and Bega Starlink Installation Checklist
This Starlink installation checklist helps field technicians complete a safe and compliant deployment for Azured and Bega sites. It guides you through risk assessment and site induction, confirms required equipment receipt, and validates line of sight using the Starlink obstruction check. Document mount selection and pre existing damage, then capture photos of roof works including mount fixings, roof penetrations, and the ODU with clear line of sight and serial number. Verify cabling to AS CA S009 2020, note conduit usage and total cable length. Install the modem in a safe location, record lights and serial number, and prove connectivity with Starlink app screenshots and speed tests. Complete engineer confirmation plus customer and technician declarations for sign off.
by Heidi Schieren, from the CommunityDownloads: 10+Get - Template
Planilla de Mediciones de Sistema DC Netsure 701/801
Planilla en espanol para documentar mediciones y estado de un sistema de energia DC. Incluye inspeccion visual de bastidores, cables y ventilacion, verificacion de ventiladores y filtros, limpieza, medicion de tensiones DC y carga del sistema, cantidad y estado de rectificadores, capacidad usada, y parametros de baterias como tension, cantidad de bancos, corriente de carga o descarga, temperatura y antiguedad. Contempla sistemas con inversores, conteo de equipos OK y en falla, y registro de corriente y potencia total. Permite declarar el estado final del sistema normal, on battery, fault o sin salida y agregar identificacion del equipo, etiquetas, numeros de serie y direccion IP. Ideal para mantenimiento preventivo y correctivo en sitios de telecom y energia.
by Veolia Servicios y Gestión de Energía Argentina UPS, from the CommunityDownloads: 10+Get - Template
Project Completion Document - Installation Type 1
This project completion and commissioning checklist helps contractors verify that AV and ICT installations are delivered to specification. It covers audio and video inputs and outputs, device firmware updates, camera positioning, control interface checks, and network connectivity. It also guides client training, site cleanup, and formal handover, with sections for outstanding items, notes, and photo documentation.
by Amanda Bongiovanni, from the CommunityDownloads: 10+Get - Template
Peoples Fibre Health and Safety Site Assurance Audit
This audit template helps telecom civil works teams assure on site health and safety during fibre installation, excavation and reinstatement. It guides auditors through dynamic risk checks, signage, lighting and guarding, documentation and permits, NRSWA competence, barriers and work area setup, pedestrian management, environmental protections, traffic management and housekeeping. It also covers plant and equipment checks, welfare provisions, fire safety, PPE use, defect reporting and sign off with acknowledgements and good practice recognition. Use it to standardize inspections, capture photo evidence and ensure compliance with the Safety at Street Works and Road Works Code of Practice.
by Martyn Caulfield, from the CommunityDownloads: 10+Get - Template
4G Small Cell OPW Site Walk Survey
This 4G small cell OPW site walk template helps field teams survey and document candidate pole locations for small cell deployments. Capture site details and letter designation, pole type and material, decorative requirements, and whether the pole is in an active utility right of way. Record power availability and distances to transformers or sources, replacement information, HOA restrictions, historic district considerations, and private property notes. Log environmental and aesthetic concerns, public right of way and jurisdiction notes, and attach site photos and additional candidates for comparison. Use this checklist to standardize evaluations and speed approvals.
by Rob Mcree, from the CommunityDownloads: 10+Get - Template
Transmission Installation Checklist
This transmission installation checklist helps telecom teams verify near and far end setup after installation. It covers outdoor and indoor tasks including antenna and RAU fixation and earthing, IF cable sealing and labeling, proper cable routing to trays, polarization marking, and photographic documentation. For indoor racks, confirm AMM earthing, module screw tightness, dual power sources, and clear labeling of power, IF, Ethernet, and fiber cables, with cabinet photos. Validate radio link configuration for both ends, received level checks, VLAN configuration, traffic routing, DCN with OSPF, network synchronization, and any SID changes. Include print screens and interference test results to complete commissioning and ensure a reliable link.
by Team Leader Ericsson, from the CommunityDownloads: 10+Get - Template
Firehawk Safety Audit Checklist v3.2
This Firehawk Safety audit checklist v3.2 helps teams assess workplace and site safety. Review safety signage, fire extinguishers and siren, assembly point visibility, PPE availability, and safe condition of cords, plugs, and equipment. Verify safety file currency, battery, base, and operations room risk assessments, and that technicians and contractors hold valid climbing and medical certificates. Check first aid kits and clear, unobstructed exits. Capture observations, corrective actions, and opportunities for improvement to drive compliance and safer operations.
by David Miller, from the CommunityDownloads: 10+Get
