Record the details of the returned equipment including the condition when it was returned. You can also indicate the previous personnel who approved the previous issuance for a detailed report. Sign the template off with your digital signature.
About author
Free 1,000+ Workplace Checklists & Templates created by the SafetyCulture team.
You might also like
- Templateby SafetyCulture
Equipment Sign Out Sheet Template
Use this template to document details of the equipment and to whom it was issued. Make sure all the relevant details about the issuance and equipment are indicated. IT or facilities personnel must sign this template off.
Downloads: 930Get - Templateby SafetyCulture
Equipment Sign Out Form
Use this equipment sign out form to record all equipment sign out during the workday. Identify as many equipment as needed for the duration of the shift and enter the equipment type, number, purpose, and the operator's name and signature. Complete the equipment sign out form with the equipment manager's comments and signature.
Downloads: 145Get - Templateby SafetyCulture
Receiving Report Template
Use this receiving report template when receiving deliveries and record all the information you need for your business. Enter the details of the delivery and the condition of the items received/returned. Take optional photos for context on the receiving report. Submit the receiving report to all intended recipients using SafetyCulture on your mobile device.
Downloads: 187Get - Templateby SafetyCulture
Emergency Lighting and Exit Sign Inspection Checklist
An emergency lighting and exit sign inspection checklist is used to ensure emergency lights are in good working condition. This template can be used by maintenance teams to document and report any defects identified. The template has been built to guide the inspector to perform the following: 1) Evaluate the physical condition of equipment, battery, and luminous 2) Take photo evidence and detailed notes of any defects found 3) Record the action needs and sent in-app notification to the relevant contact 4) Document overall assessment and recommendations 5) End inspection with a digital signature and timestamp to validate record of inspection
Downloads: 1,974Get