Skip to content
SafetyCulture

Telecommunications & Media

Discover easy-to-use Telecommunication & Media templates and training courses for distribution, compliance check, and more. Use them to gain practical knowledge, streamline your work, and stay on top of industry best practices. Customize these resources to fit your needs and excel in the Telecommunication & Media industry with confidence.

1,382 results
  • TPG Telecom - Fibre Operation Group -Contractor Daily Report " Civil Works"
    by Ramzi Alajez, from the Community
    Downloads: 40+
    Get
  • Werkbon Projecten Vconsyst
    Template

    Werkbon Projecten Vconsyst

    Werkbon Voor Projecten

    by John-Robin Staring, from the Community
    Downloads: 40+
    Get
  • N07 TM/SE 2nd Opinion
    Template

    N07 TM/SE 2nd Opinion

    N07 Cancellation Reduction Plan

    by Jody Day, from the Community
    Downloads: 40+
    Get
  • Falcon MxU Build Completion Checklist (FBCC)
    Template

    Falcon MxU Build Completion Checklist (FBCC)

    Project Falcon - MxU Services

    by Chris Olson, from the Community
    Downloads: 40+
    Get
  • 1 - Selling Skills Evaluation (All In One)
    Template

    1 - Selling Skills Evaluation (All In One)

    3150 - SSE - Overall Evaluation

    by Korey Schenewerk, from the Community
    Downloads: 40+
    Get
  • Telecommunications Survey - SCCIA/Electranet
    by Andy Holland, from the Community
    Downloads: 40+
    Get
  • Bell Mobility Cell Site Inspection
    Template

    Bell Mobility Cell Site Inspection

    Audit form to be used when conducting a cell site inspection

    by Keith M., from the Community
    Downloads: 40+
    Get
  • Enable Connect Plan Checklist
    Template

    Enable Connect Plan Checklist

    This Enable Connect Plan template supports fibre broadband connection planning from site survey through customer consent. Capture work order and simPRO job numbers, address, install date, and contact details. Record right of way and multi-dwelling consents, boundary and in-property build requirements including trenching, thrusting, ducting, and ETP placement. Document inside and outside property consents, alarm and third-party service considerations, and end user terms acknowledgment. Include detailed installation descriptions, photos, Netmap screenshots, and traffic management notes to streamline approvals and ensure compliant installations.

    by Rajat Sharma, from the Community
    Downloads: 40+
    Get
  • S03 Revisit Capability Plan
    Template

    S03 Revisit Capability Plan

    V2 Nov 2017

    by Richard Gibbs, from the Community
    Downloads: 40+
    Get
  • Colleague Accreditation
    Template

    Colleague Accreditation

    EECC and pinpoint accreditation checklist

    by Adam Evans, from the Community
    Downloads: 40+
    Get
  • UK GOV Performing Arts COVID 19 Safety Guidance
    SafetyCulture logo
    Template

    UK GOV Performing Arts COVID 19 Safety Guidance

    Comprehensive UK Government guidance to help performing arts venues, producers, and performers work safely during COVID 19. Learn how to complete risk assessments, manage capacity limits indoors and outdoors, plan rehearsals and performances, protect staff and audiences, and meet legal requirements. Key topics include social distancing, ventilation, cleaning and hygiene, face coverings and PPE, NHS Test and Trace, audience management, seating and queuing, close contact services such as hair and makeup, and handling props and instruments. Covers professional and non professional activity with practical steps for theatres, concert halls, and grassroots music venues.

    by SafetyCulture
    Downloads: 30+
    Get
  • HSS Site Visitor Sign Off
    Template

    HSS Site Visitor Sign Off

    This site visitor sign off template outlines essential safety information for observers visiting field engineering installations. It covers mandatory PPE such as hard hats and hi vis vests, safe distances from work areas, precautions for working at height, and guidance to avoid interfering with engineering tasks. The form captures visitor, engineer, and manager signatures to confirm understanding and compliance, helping organizations reduce risk and ensure a safe, compliant visit.

    by Steve Kelso, from the Community
    Downloads: 30+
    Get
  • ALDI Works Installation Checklist
    Template

    ALDI Works Installation Checklist

    Use this ALDI Works installation checklist to document site works from arrival to completion. Record key job details, time on and off site, and note any outstanding tasks. Capture photos of network cabinets and cable routes, include a floor plan showing cabinet locations, and attach any other relevant images. Provide supporting information for re-visits such as access equipment, cable length and type, termination details, and estimated installation duration. Obtain client and engineer signatures to confirm completion.

    by James Hegarty, from the Community
    Downloads: 30+
    Get
  • Underground Duct Condition Survey Checklist
    Template

    Underground Duct Condition Survey Checklist

    Use this underground duct condition survey checklist to assess the state of buried duct networks. Capture access point information, evaluate duct occupancy from empty to extremely full, document health and safety issues, and attach photos for evidence. Include location, personnel, and client or site details, plus signature with time and date for accountability. This template helps teams standardize inspections and plan maintenance for telecom or utility duct infrastructure.

    by Ash Kalhor, from the Community
    Downloads: 30+
    Get
  • MDU Survey for Complex Buildings
    Template

    MDU Survey for Complex Buildings

    A practical MDU survey template for complex buildings to support HFC network design and installation. Capture address and surveyor details, verify access, and document building entry points, lead-in pits, LIC, MDF/BEP, and proposed cable routes. Build a MUD map with wall measurements, levels, roof height estimates, penetrations, primary and secondary tap locations, and distances to the furthest EUP. Include required floor-by-floor designs, side elevations, and photos or video of key areas to guide CAD and ensure accurate, efficient installs.

    by Angus Rex, from the Community
    Downloads: 30+
    Get
  • Clearvision Post QA Version 6
    Template

    Clearvision Post QA Version 6

    This Clearvision Post QA checklist helps telecom teams audit fiber builds inside and outside property boundaries. Capture photos and notes for trenches in soft or hard surfaces, microslot cuts, aerial works, surface mounting and reinstatement. Verify FTP, FAT, BUDI and IFDB installations, fiber management, ONT setup, VoIP connection and draw tapes. Record as-built alignment, site cleanliness, pass or fail outcomes, and areas affected across civil, cabling and reinstatement. Includes fields for personnel, signatures and corrective actions.

    by Joseph Stevens, from the Community
    Downloads: 30+
    Get
  • RON NGA Job Form for Fiber Network Work
    Template

    RON NGA Job Form for Fiber Network Work

    The RON form standardizes NGA fiber job documentation for field teams. Capture S/O number, location, lead and company details, network type, job description, and the exact work performed such as blowing and splicing fiber, OFDC connections, hauling, jointing, and remediation. Log enclosure type and ID, traffic management, site setup, and attach before and after photos. The template supports consistent reporting and emailing of results to project stakeholders.

    by K9344977 Prasad, from the Community
    Downloads: 30+
    Get
  • FTTH Point of Work Risk Assessment for Streetworks
    Template

    FTTH Point of Work Risk Assessment for Streetworks

    This FTTH point of work risk assessment supports telecom streetworks crews in planning and controlling tasks on public roads. Record site details, road speed limit, vehicle and pedestrian flow, and site features such as crossings or schools. Confirm availability of Safety at Streetworks guidance and vehicle beacons. Select controls for task duration (mobile, short, or standard works) with appropriate signing, lighting, and guarding. Capture checks for opened pits, log GDU readings, and ensure continuous monitoring. Add pre-setup and setup photos, contractor information, and complete operative and supervisor sign-offs.

    by Andy Holland, from the Community
    Downloads: 30+
    Get
  • CMUX Commission Test v1
    Template

    CMUX Commission Test v1

    This CMUX Commission Test v1 checklist guides technicians through commissioning a telecommunications CMUX node. It covers project and system details, configuration verification, power-up checks for subracks and fans, broadband and narrowband card power-up (AICC, AANC, BSEC, LTAC/LTAC-C, NACC/NACC-C), alarm validation in AWS, ADM, and CMEM, ADSL port synchronization, and end-to-end speed testing. The template also includes optical fibre bearer testing with line power readings, insertion loss and optical margin calculations, and bit error measurements. Final sections address equipment, environmental and power alarms, housing checks, and recording non-conformances.

    by Edward Hu, from the Community
    Downloads: 30+
    Get
  • Telecom Database Audit Checklist Template
    Template

    Telecom Database Audit Checklist Template

    This telecom database audit checklist helps network teams validate OSS and inventory records across TRAC, MITS, DIPS, MULTIMAN, CADLINK, ALARMS, and CRAMER. Verify that links and ports match design pack details, confirm serial numbers for cards, SFPs and subracks, ensure port allocations and locations are accurate, and check that TRAC authority is correctly applied. Review fibre allocations and port comments, align site drawings and rack layouts, and confirm alarm snapshots and remote alarm settings. Validate network elements, labels, and utilisation to maintain accurate, compliant network records.

    by Edward Hu, from the Community
    Downloads: 30+
    Get
  • VSZ NGA Provisioning - Aug 2015
    Template

    VSZ NGA Provisioning - Aug 2015

    Template for field QA for Chorus NGA provisioning (NDF-159)

    by uday kakal, from the Community
    Downloads: 30+
    Get
  • N0301 Cancellation Report
    Template

    N0301 Cancellation Report

    This N0301 Cancellation Report template helps field engineers and service teams capture job details, select cancellation reasons such as access restrictions, customer no show, health and safety issues, no line of sight, parking or permission restrictions, DAT/SAT required, unsuitable date, or customer change of mind. Add photos, document what was done to resolve, note second opinions and manager discussions, record rebooking details, and provide recommendations to complete the job. Includes engineer signature field.

    by Daniel Cain, from the Community
    Downloads: 30+
    Get
  • Visionstream Near Miss Reporting Template
    Template

    Visionstream Near Miss Reporting Template

    Use this Visionstream Near Miss Reporting template to document incidents that almost caused harm during telecom maintenance and UFB build activities. Capture who reported the event, the location, date and time, what was observed, supporting photos, work type, contractor details, and actions taken on site. Standardizing near miss reporting helps identify hazards, share learnings, and prevent future incidents across field teams.

    by Mel Dawson, from the Community
    Downloads: 30+
    Get
  • FSD Tasmania Safety, Quality and Knowledge Audit
    Template

    FSD Tasmania Safety, Quality and Knowledge Audit

    This supervisor audit ensures safety, quality, and knowledge compliance for FSD Tasmania crews delivering telecommunications installations. It covers general readiness (start cards, blue book, SWMS sign-on and re-induction, required licences and tickets, first aid, spill and sharps kits), civil works (traffic management, walk-throughs, pedestrian safety, dig permits, plant pre-starts, service histories, gas detection, cable locating, PPE, DBYD awareness, trenching depths, reinstatement, customer notifications, pit compliance), aerial work (like-for-like qualifications, IP tickets, LV gloves in test, pole top rescue and working at heights, SAD zones, ladder testing, TS-02 awareness, rescue kit placement, height safety), and internal installs (PCD placement, EU consultation on NTD, hazard checks, power isolation and tagging, borescope and stud/electricity finder, secure cable fixing and compliant NTD placement).

    by Ramon Brasnja, from the Community
    Downloads: 30+
    Get