Skip to content
SafetyCulture

Telecommunications & Media

Access telecommunications and media templates and training courses to support equipment installation, incident reporting, and customer-facing work. Help your teams reduce rework, keep quality consistent, and manage day-to-day operations across projects and sites.

Browse Telecommunications & Media

1,377 results
  • FTTH - 4th Utility - Phase 1 Walk Off Report - SCCI V1.1
    by Andy Holland, from the Community
    Downloads: 40+
    Get
  • ENGINEERS DAILY LOG
    Template

    ENGINEERS DAILY LOG

    N0209 ENGINEERS DAILY LOG

    by Donald MacMaster, from the Community
    Downloads: 40+
    Get
  • Advanced Network Services Scope Report V1.7
    by Craig Bibby, from the Community
    Downloads: 40+
    Get
  • Visionstream Site Shutdown Checklist December 2019
    Template

    Visionstream Site Shutdown Checklist December 2019

    Applies to site closures being unoccupied for > 3days.

    by Mel Dawson, from the Community
    Downloads: 40+
    Get
  • Property Data Base
    Template

    Property Data Base

    Property Data Base

    by Robert Mangar, from the Community
    Downloads: 40+
    Get
  • S03 Engineer Development - Version 1/2
    Template

    S03 Engineer Development - Version 1/2

    Engineer Development Plans

    by Richard Gibbs, from the Community
    Downloads: 40+
    Get
  • Technik Partner - Übergabe Messgerät
    Template

    Technik Partner - Übergabe Messgerät

    Technik Partner - Übergabe Messgerät

    by Sarah Hodza, from the Community
    Downloads: 40+
    Get
  • FOS Field Visit Evaluation and Follow Up_2017
    Template

    FOS Field Visit Evaluation and Follow Up_2017

    Field Visit Evaluation and Follow Up 2017

    by Training Team, from the Community
    Downloads: 40+
    Get
  • Virgin Media IRS Walk Off Report (SCCI V3.6)
    Template

    Virgin Media IRS Walk Off Report (SCCI V3.6)

    This Virgin Media Integrated Reception System Walk Off Report is used to capture site and access information, document fire safety requirements, and verify installation details. Record property counts, floor levels, and photos. Note access arrangements and fire-stopping needs, including fire clip spacing and sealing. Detail IRS system components such as rig and dish locations, cabinet numbers and coverage, with supporting photographs and recommendations. Log Virgin Media system elements including lock boxes and socket installation specifics. Conclude with additional notes and a formal completion sign-off.

    by Nelio Goncalves, from the Community
    Downloads: 40+
    Get
  • DRAFT Chorus Colocation Pole Assesment
    Template

    DRAFT Chorus Colocation Pole Assesment

    Application form to assess use of an existing Chorus pole

    by Chorus Poles, from the Community
    Downloads: 40+
    Get
  • ADB Cable Services - NOLA One Fiber - 5/6/21
    by Randy Carlton, from the Community
    Downloads: 40+
    Get
  • Fiber Optic Splicing Report for NOLA OneFiber
    Template

    Fiber Optic Splicing Report for NOLA OneFiber

    Use this fiber optic splicing report template to document NOLA OneFiber field work. Capture customer info, work order, site location, crew roles, work type such as splicing, testing, and panel installation, splice details, cable IDs and directions, enclosure and pipe footage markers, trays and case types, MST and FDT, drop footage, and completion times. Attach photos of panels, racks, trays, tags, closures, and site conditions. Includes a pre-task safety checklist for PPE, traffic control, equipment inspection, hazards, and job brief. Record NOC release, weather, and additional notes for quality and traceability.

    by Randy Carlton, from the Community
    Downloads: 40+
    Get
  • FTTH Build Walk-Off Report SCCI V1.5
    Template

    FTTH Build Walk-Off Report SCCI V1.5

    Use this FTTH build walk off report to capture site information, access needs, fire stopping requirements, trunking and fire clip compliance, distribution points, comms cabinet details, photos, and final sign off. Ideal for fiber network contractors handing over 4th Utility installations, it standardizes documentation, verifies completion against the job pack, and records as built evidence for quality and safety compliance.

    by Andy Holland, from the Community
    Downloads: 40+
    Get
  • NBN Sub-Contractor Safety Equipment Audit
    Template

    NBN Sub-Contractor Safety Equipment Audit

    Use this bi-annual safety equipment audit to verify subcontractor compliance for NBN Fixed Wireless and HFC Fibre work. The checklist covers WHS obligations, licenses and IDs, Safe Work Method Statements, Safety Data Sheets, electrical safety, mandatory PPE, height safety gear checks to AS NZS standards, ladders and accessories, vehicles and signage, tools and testing equipment, first aid kit contents, and banned items. Capture photos, expiry dates and inspection records, then export the completed PDF to the nominated HSEQ address to demonstrate readiness for site work.

    by Patrick Ma, from the Community
    Downloads: 40+
    Get
  • Southern Light Tower Site Audit
    Template

    Southern Light Tower Site Audit

    This tower site audit template helps document installation quality and current condition of Southern Light microwave and Ethernet backhaul equipment. It covers tower safety climb systems, dish mounts and alignment, line routing and securing, grounding and resistance checks, weatherproofing of lines and flex twists, waveguide routing along the ice bridge, cabinet installation and grounding, shelter entry and support, rack mounting, and equipment amperage draw. Use this checklist to capture photos, note discrepancies, and verify compliance with site standards.

    by james Johnson, from the Community
    Downloads: 40+
    Get
  • FTTH - toob - Build Walk Off Report - SCCI V1.2
    by Andy Holland, from the Community
    Downloads: 40+
    Get
  • FTTH Build Walk-Off Report - Phase 2 Power Test
    Template

    FTTH Build Walk-Off Report - Phase 2 Power Test

    This FTTH Build Walk-Off Report guides Phase 2 power testing for new fiber installations. Capture site details, access requirements, dwelling counts, and comms cabinet information with supporting photos. Record system data including number of distribution points, properties served, and conduct one property test per 8-way splitter. Document property numbers, results, and photos at the point of entry for up to eight tests, noting if further testing is required. Conclude with red line drawings, additional notes, and a formal sign-off to confirm the installation meets the job pack requirements and is ready for handover.

    by Andy Holland, from the Community
    Downloads: 40+
    Get
  • Southern Light New Eqiuipment Installation/Removal
    Template

    Southern Light New Eqiuipment Installation/Removal

    Install or Removal of SL Equipment

    by Aaron Kjar, from the Community
    Downloads: 40+
    Get
  • TPG Telecom - Fibre Operation Group -Contractor Daily Report " Civil Works"
    by Ramzi Alajez, from the Community
    Downloads: 40+
    Get
  • Werkbon Projecten Vconsyst
    Template

    Werkbon Projecten Vconsyst

    Werkbon Voor Projecten

    by John-Robin Staring, from the Community
    Downloads: 40+
    Get
  • N07 TM/SE 2nd Opinion
    Template

    N07 TM/SE 2nd Opinion

    N07 Cancellation Reduction Plan

    by Jody Day, from the Community
    Downloads: 40+
    Get
  • Falcon MxU Build Completion Checklist (FBCC)
    Template

    Falcon MxU Build Completion Checklist (FBCC)

    Project Falcon - MxU Services

    by Chris Olson, from the Community
    Downloads: 40+
    Get
  • 1 - Selling Skills Evaluation (All In One)
    Template

    1 - Selling Skills Evaluation (All In One)

    3150 - SSE - Overall Evaluation

    by Korey Schenewerk, from the Community
    Downloads: 40+
    Get
  • Bell Mobility Cell Site Inspection
    Template

    Bell Mobility Cell Site Inspection

    Audit form to be used when conducting a cell site inspection

    by Keith M., from the Community
    Downloads: 40+
    Get

Practical safety and quality resources for telecommunications and media teams

Give telecommunications and media teams faster access to the resources they need to do quality work. SafetyCulture’s Content Library is a centralized digital library of industry-standard instructional tools and quality control inspections, audits, and checklists built for everyday operations. Instead of building materials from scratch, you can easily provide instruction and manage operations with proven resources that support diverse workplaces.

Why digital resources matter

Digital resources make it easier to roll out guidance and standardize work across teams. Online access also helps teams respond faster to issues and apply updates without inefficient back-and-forths.

Explore how you can use the Content Library for your telecommunications and media operations:

  • Enhance dialogue with clients and customers through courses on call center customer service.

  • Monitor call quality with call dispatch logs and call monitoring checklists.

  • Guarantee safety and compliance with site survey reports and equipment installation templates.

Every resource in the Content Library is fully digital and ready to use, making it easy to adapt content to your workflows and share it across your team. When used within the SafetyCulture platform, these resources support better visibility, smoother inspections, and stronger safety and quality outcomes for your team.