Categories
Telecommunications & Media
Discover easy-to-use Telecommunication & Media templates and training courses for distribution, compliance check, and more. Use them to gain practical knowledge, streamline your work, and stay on top of industry best practices. Customize these resources to fit your needs and excel in the Telecommunication & Media industry with confidence.
- Template
DSI - Site Survey Report
This technical documentation template provides a structured framework for conducting and recording audiovisual system installation site surveys. It covers essential aspects including location details, room specifications, rack installations, audio/video equipment documentation, control systems, and custom plate configurations. The guide ensures thorough documentation of technical requirements such as ceiling heights, cable paths, power specifications, and equipment measurements. It includes sections for documenting both new and existing equipment (OFE), specific cable length requirements, and various installation-specific details. This comprehensive survey template helps ensure all critical technical and logistical information is captured for successful AV system implementations.
by Mark Conaway, from the CommunityDownloads: 40+Get - Template
Thiess - NBN Build Drop Audit. V2.3.1
This document provides detailed guidelines for conducting NBN build drop audits, ensuring compliance with NBN-TE-CTO standards. It covers critical aspects of installation including pit requirements, lead-in conduit specifications, PCD mounting standards, and workmanship quality. The checklist includes specific measurements for clearances, depth requirements, and safety standards for various installation components. It guides auditors through the inspection process of Telstra LIC installations, cable management, and overall workmanship quality. The document is essential for contractors and auditors to ensure installations meet NBN compliance standards and maintain high-quality service delivery. It includes detailed specifications for separation guidelines from other utilities, proper mounting techniques, and safety requirements.
by Chris Gunn, from the CommunityDownloads: 40+Get - Template
VPL UFB Connect reporting. DF20171020.1
Form for UFB Connect techs to provide reports on connect tasks. Rev:20170818.1
by Daniel Free, from the CommunityDownloads: 40+Get - Template
Line of Sight Survey (LOS) v1.0
Site Survey to determine Line of Site (LoS) microwave path between two sites. Specific efforts are to establish Line of Site from ground level and to identify the local sites and mid path environment as well as identify antenna mounting requirements, or if unable to provide insight towards these objectives and a proposal for deeper survey requirements.
by Irtiza Mumtaz, from the CommunityDownloads: 40+Get - Template
Boots comms cabinet survey v1.4
A detailed survey template designed for documenting and auditing communications infrastructure in Boots store locations. The template covers essential documentation of comms cabinets, including their locations, floor positions, and detailed switch configurations. It enables thorough documentation of multiple cabinet setups, with provisions for photographic evidence of each component. The survey also includes sections for BE (Back-End) area verification, matching against floor plans, and documenting available ports and sockets. This systematic approach ensures complete network infrastructure documentation, making it invaluable for maintenance, upgrades, and troubleshooting purposes. The template includes space for additional observations and comments, allowing for comprehensive documentation of any unique or noteworthy aspects of the installation.
by Hasnain Najafi, from the CommunityDownloads: 40+Get - Template
Visionstream Site Shutdown Checklist December 2019
Applies to site closures being unoccupied for > 3days.
by Mel Dawson, from the CommunityDownloads: 40+Get - Template
Virgin Media IRS Walk Off Report (SCCI V3.6)
This Virgin Media Integrated Reception System Walk Off Report is used to capture site and access information, document fire safety requirements, and verify installation details. Record property counts, floor levels, and photos. Note access arrangements and fire-stopping needs, including fire clip spacing and sealing. Detail IRS system components such as rig and dish locations, cabinet numbers and coverage, with supporting photographs and recommendations. Log Virgin Media system elements including lock boxes and socket installation specifics. Conclude with additional notes and a formal completion sign-off.
by Nelio Goncalves, from the CommunityDownloads: 40+Get - Template
Fiber Optic Splicing Report for NOLA OneFiber
Use this fiber optic splicing report template to document NOLA OneFiber field work. Capture customer info, work order, site location, crew roles, work type such as splicing, testing, and panel installation, splice details, cable IDs and directions, enclosure and pipe footage markers, trays and case types, MST and FDT, drop footage, and completion times. Attach photos of panels, racks, trays, tags, closures, and site conditions. Includes a pre-task safety checklist for PPE, traffic control, equipment inspection, hazards, and job brief. Record NOC release, weather, and additional notes for quality and traceability.
by Randy Carlton, from the CommunityDownloads: 40+Get - Template
FTTH Build Walk-Off Report SCCI V1.5
Use this FTTH build walk off report to capture site information, access needs, fire stopping requirements, trunking and fire clip compliance, distribution points, comms cabinet details, photos, and final sign off. Ideal for fiber network contractors handing over 4th Utility installations, it standardizes documentation, verifies completion against the job pack, and records as built evidence for quality and safety compliance.
by Andy Holland, from the CommunityDownloads: 40+Get - Template
NBN Sub-Contractor Safety Equipment Audit
Use this bi-annual safety equipment audit to verify subcontractor compliance for NBN Fixed Wireless and HFC Fibre work. The checklist covers WHS obligations, licenses and IDs, Safe Work Method Statements, Safety Data Sheets, electrical safety, mandatory PPE, height safety gear checks to AS NZS standards, ladders and accessories, vehicles and signage, tools and testing equipment, first aid kit contents, and banned items. Capture photos, expiry dates and inspection records, then export the completed PDF to the nominated HSEQ address to demonstrate readiness for site work.
by Patrick Ma, from the CommunityDownloads: 40+Get - Template
FTTH Build Walk-Off Report - Phase 2 Power Test
This FTTH Build Walk-Off Report guides Phase 2 power testing for new fiber installations. Capture site details, access requirements, dwelling counts, and comms cabinet information with supporting photos. Record system data including number of distribution points, properties served, and conduct one property test per 8-way splitter. Document property numbers, results, and photos at the point of entry for up to eight tests, noting if further testing is required. Conclude with red line drawings, additional notes, and a formal sign-off to confirm the installation meets the job pack requirements and is ready for handover.
by Andy Holland, from the CommunityDownloads: 40+Get
