Skip to content
SafetyCulture
Template

FTTH City Fibre Build Walk-Off Report SCCI V1.5

by Andy Holland, from the Community

Downloads: 40+
Get this template

This FTTH City Fibre Build Walk-Off Report is a field completion checklist for documenting fibre installation works in residential blocks. Capture site information, access requirements, and fire safety compliance including trunking, fire clips above doors and exits, and any fire stopping. Record light loss readings, distribution point locations and served properties, plus street cabinet numbers, fibre connectivity, and lead-in details. Upload photos of DPs, cables, cabinets, trunking, and red line drawings, then finalize with notes and sign-off to confirm the build matches the job pack.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.