Skip to content
SafetyCulture
Template

FTTH Build Walk Off Report Phase 1 Template

by Andy Holland, from the Community

Downloads: 0

Document your fiber to the home Phase 1 build walk off with this structured template. Capture site information and access requirements, note fire regulations and confirm fire clips on trunking and above doors, record ceiling hatches and internal or external drop cables, and document any fire stopping. Log distribution points with locations, served properties, cable photos and notes, plus comms cabinet details and access keys. Attach photos, red line drawings, and complete sign off to verify work quality and compliance.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.