Skip to content
SafetyCulture
Template

FTTH Build Walk Off Report Phase 2

by Andy Holland, from the Community

Downloads: 50+

This FTTH Phase 2 build walk off checklist helps field teams document site details, access requirements, and installation work for fiber to the home projects. Capture comms cabinet numbers and photos, record the number of distribution points, add red line drawings, and describe work completed. Verify compliance with job pack instructions and note fire safety requirements such as using fire clips and resealing any penetrations. Include additional notes, attach photographic evidence, and complete the final sign off to confirm the build is finished to standard.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

FTTH Build Walk Off Report Phase 2 Checklist | Free Template