Use this FTTH Phase 2 power test walk off report to verify fiber build quality during site walk off. Record site and access details, postcode and job reference, number of dwellings, and communications cabinet number with a photo. Log system information including number of distribution points, DP numbers, and properties served. Perform one test for each 8 way splitter and capture the property number for each test. Add photos at the point of entry as evidence, note additional requirements, attach a red line drawing, and complete the final sign off to confirm the installation meets the job pack.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
