Skip to content
SafetyCulture
Template

FTTH CityFibre Walk Off Power Test Checklist

by Andy Holland, from the Community

Downloads: 0

Standardize FTTH build walk off verification with a guided power test checklist for CityFibre jobs. Record site details, postcode and job reference, access requirements, dwellings and DP counts, and per-dwelling power readings at 1310, 1550 and 1625. Attach a red line drawing photo, add notes, capture the walk off name and date, and complete sign off to confirm installation matches the job pack.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.