This FTTH build walk off report for Phase 1 helps field teams document fiber installation quality and compliance on 4th Utility projects. Capture site details, access requirements, number of dwellings and floors, photos of entrances, trunking and fire clips, drop cable routing, and any fire stopping performed. Record DP counts, locations, and photos, plus comms cabinet details and access keys. Attach red line drawings, add notes, and complete sign off to confirm the installation matches the job pack.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
