Use this FTTH VX Build Walk Off Report to document fiber network build completion. Record site info and access, dwelling counts, fire regulations compliance, trunking and fire clips, drop cable routes, and any fire stopping. Capture DP locations and served properties, comms cabinet details, fiber connectivity, and light loss readings. Attach photos, job pack images, and red line drawings, then complete installer sign off and notes.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
