Use this FTTH Build Walk Off Report template to document completion of F and W fiber installations against the SCCI V1.0 job pack. Capture site details, MDU compliance, trunking and fire clip requirements, light loss readings, distribution point locations, street cabinet and connectivity information, as-built photos, and red line drawings. Include access notes, lead-in locations, and final sign-off to ensure quality, safety, and handover readiness.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
