Skip to content
SafetyCulture
Template

FTTH CityFibre Build Walk Off Report SCCI V1.8

by Andy Holland, from the Community

Downloads: 40+
Get this template

This FTTH CityFibre build walk off report (SCCI V1.8) is a comprehensive checklist for MDU fiber installations. Capture site details, job references and routing, confirm work against the approved job pack, and attach required photographs. Record access requirements, number of dwellings and floors, and comply with fire safety by documenting trunking, fire clips, penetrations and fire stopping; include FIRAS URN if applicable. Log distribution points (DPs), street cabinet or ASN, fibre connectivity, lead in locations, and light loss readings. Conclude with quality checks, incidents, subcontractor details and sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.