FTTH CityFibre Build Walk Off Report SCCI V1.8
by Andy Holland, from the Community
This FTTH CityFibre build walk off report (SCCI V1.8) is a comprehensive checklist for MDU fiber installations. Capture site details, job references and routing, confirm work against the approved job pack, and attach required photographs. Record access requirements, number of dwellings and floors, and comply with fire safety by documenting trunking, fire clips, penetrations and fire stopping; include FIRAS URN if applicable. Log distribution points (DPs), street cabinet or ASN, fibre connectivity, lead in locations, and light loss readings. Conclude with quality checks, incidents, subcontractor details and sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
