FTTH Build Walk-Off Report Phase 2 (ERIS Plan B)
by Andy Holland, from the Community
This FTTH Build Walk-Off Report supports Phase 2 field verification for ERIS Plan B deployments. Capture site information, access requirements, number of dwellings, and communications cabinet details. Document description of works, distribution points, and system information, including photos for cabinets, DPs, and red line drawings. Record notes, confirm work completed as per the job pack, and obtain final sign-off to ensure installation quality and compliance. Includes reminders for fire clip use and resealing any disturbed fire seals to meet current fire safety regulations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
