This project commissioning checklist can be used by commissioning teams during the planning, designing, construction, and post-construction phases of a project to achieve desired outcomes. This checklist includes valuable elements and success factors of project commissioning such as assisting the owner (client) evaluate the facility's requirements, backchecking mid-construction documents, and more. Commissioning managers can type or dictate additional recommendations within the SafetyCulture mobile app.
About author
Free 1,000+ Workplace Checklists & Templates created by the SafetyCulture team.
You might also like
- Templateby SafetyCulture
Equipment Commissioning Checklist
This equipment commissioning checklist is used for the commissioning of burners/boilers in an industrial or commercial power plant. Easily customize or build your own checklist using SafetyCulture template editor to meet specific equipment design requirements and fulfill company needs. Each inspection item can also be set to "mandatory" to make sure that every detail about the equipment commissioning is checked.
416 downloadsGet - Templateby SafetyCulture
Piping Pre-commissioning Checklist
This piping pre-commissioning checklist can be used by pipeline engineers to perform flooding spread set-up (dry commissioning), pipeline pig valve launching sequence (wet commissioning), and pipeline flooding, pigging, gauging, and chemical injection (commissioning).
96 downloadsGet - Templateby SafetyCulture
Electrical Commissioning Checklist
This electrical commissioning checklist is used for the commissioning of low voltage installations in a building. Use this checklist to verify the compliance of the switchboard, main switch and circuit breaker, distribution board, and final circuits with client specifications. This checklist has been designed to make it easier for inspectors to check the working space and facilities and conductors, cables and wiring.
527 downloadsGet - Templateby SafetyCulture
Plant Commissioning Checklist
This plant commissioning checklist is used for the commissioning of wastewater projects or treatment plants. This checklist has been designed to make it easier for inspectors to verify the installation, function, and documentation of pumping systems and the preliminary, secondary, and tertiary treatment process equipment.
239 downloadsGet