Use this construction daily log template to identify the day's weather and enter lost time due to precipitation. Name the materials and the quantity received and spent. Enter the number of crew present and name those who may have reported sick for the day and hours worked if they still reported.
About author
Free 1,000+ Workplace Checklists & Templates created by the SafetyCulture team.
You might also like
- Templateby SafetyCulture
General Construction Daily Report
Use this general construction daily report to record the project's daily progress. Identify all the site's crew for the day and the individual hours worked. Describe all the equipment and hours in operation. Name the subcontractors and time on-site. Enumerate all the materials and quantity. Complete the report by describing the job's progress and affixing your signature to confirm the content of the report.
908 downloadsGet - Templateby SafetyCulture
Construction Daily Report Checklist
Construction Daily Report of Activities to record the activities for the day. Provide details about the job, weather and precipitation, workforce, instructions given, delays, and materials. Document any risks observed or incidents that occurred and include photos. Indicate inspections that happened and record visitors on-site. Complete the report by including a digital signature of the foreman or site supervisor.
1653 downloadsGet - Templateby SafetyCulture
Daily Log
Use this template to enter the general information such as company name, registered address, department, employee name, and role. Then, write the description of an activity that occurred in the workplace and indicate if the type of event is new, ongoing, related, or others. Next, take and/or attach photos relevant to the log entry and make annotations wherever necessary to ensure clarity and add other observations or comments as well. Finally, validate the completion of the log with a digital signature that automatically includes date and time stamps.
195 downloadsGet - Templateby SafetyCulture
Boiler Log - Daily Inspection
A boiler log is used for the daily inspection of boilers to make sure that the pressure and temperature are within the recommended range. Use this log template to record scheduled daily inspection or multiple inspections within a day to maintain the safety of boilers.
73 downloadsGet