Skip to content
SafetyCulture
Template

Daily Construction Log

by SafetyCulture

Free
413

Use this construction daily log template to identify the day's weather and enter lost time due to precipitation. Name the materials and the quantity received and spent. Enter the number of crew present and name those who may have reported sick for the day and hours worked if they still reported.

About author

Free 1,000+ Workplace Checklists & Templates created by the SafetyCulture team.

You might also like

  • General Construction Daily Report
    SafetyCulture logo
    Template

    General Construction Daily Report

    Use this general construction daily report to record the project's daily progress. Identify all the site's crew for the day and the individual hours worked. Describe all the equipment and hours in operation. Name the subcontractors and time on-site. Enumerate all the materials and quantity. Complete the report by describing the job's progress and affixing your signature to confirm the content of the report.

    by SafetyCulture
    908 downloads
    Get
  • Construction Daily Report Checklist
    SafetyCulture logo
    Template

    Construction Daily Report Checklist

    Construction Daily Report of Activities to record the activities for the day. Provide details about the job, weather and precipitation, workforce, instructions given, delays, and materials. Document any risks observed or incidents that occurred and include photos. Indicate inspections that happened and record visitors on-site. Complete the report by including a digital signature of the foreman or site supervisor.

    by SafetyCulture
    1653 downloads
    Get
  • Daily Log
    SafetyCulture logo
    Template

    Daily Log

    Use this template to enter the general information such as company name, registered address, department, employee name, and role. Then, write the description of an activity that occurred in the workplace and indicate if the type of event is new, ongoing, related, or others. Next, take and/or attach photos relevant to the log entry and make annotations wherever necessary to ensure clarity and add other observations or comments as well. Finally, validate the completion of the log with a digital signature that automatically includes date and time stamps.

    by SafetyCulture
    195 downloads
    Get
  • Boiler Log - Daily Inspection
    SafetyCulture logo
    Template

    Boiler Log - Daily Inspection

    A boiler log is used for the daily inspection of boilers to make sure that the pressure and temperature are within the recommended range. Use this log template to record scheduled daily inspection or multiple inspections within a day to maintain the safety of boilers.

    by SafetyCulture
    73 downloads
    Get