The engineering team can use this vessel pre-departure checklist upon receipt of the one hour notice for departure in order to prepare the ship for departure from the port to open water.
About author
Free 1,000+ Workplace Checklists & Templates created by the SafetyCulture team.
You might also like
- Templateby SafetyCulture
Ship Departure Checklist
Mariners can use this vessel departure checklist to help prepare the vessel and the crew before navigating into open waters. Created with international and local regulations in mind, this ship departure checklist covers the following: navigation and communication, documentation, steering and propulsion, safety, before cast-off, right after cast-off, and open water.
Downloads: 136Get - Templateby SafetyCulture
Vessel Arrival Checklist - Engine Room
The team of marine engineers can use this vessel pre-arrival checklist upon receipt of the one hour notice from the bridge in order to prepare the ship for arrival at the port (anchorage, berth, berth after anchorage).
Downloads: 45Get - Templateby SafetyCulture
Boeing 737-800 Procedure Checklist
This template is a complete checklist used for actual B737 flights. Includes electrical power up, preflight, departure clearance, engine, takeoff, descent, and etc.
Downloads: 209Get - Templateby SafetyCulture
Ship Arrival Checklist
Mariners at the bridge and in the engineering team can use this vessel arrival checklist to help ensure that the ship is ready to arrive at the port. Adapted from a pre-arrival-checklist, use this 72-96 hours before the intended arrival to prepare the navigation and communication, documentation, steering and propulsion, safety, crew, etc.
Downloads: 189Get