Categories
Telecommunications & Media
Discover easy-to-use Telecommunication & Media templates and training courses for distribution, compliance check, and more. Use them to gain practical knowledge, streamline your work, and stay on top of industry best practices. Customize these resources to fit your needs and excel in the Telecommunication & Media industry with confidence.
- Template
Rack Integration Quality Control Checklist
This Rack Integration Quality Control Checklist helps AV and communications teams verify every stage of a rack build before deployment. It covers initial checks such as receiving the BOM, approved drawings, delivery tickets, and documentation. Detailed inspections include rack-mounted equipment placement, adapters and supports, consistent hardware and finishes, and proper blanks and vents. Labeling follows Infocomm standards for signal and power cables, with clear equipment and power labeling. Wiring and harnessing best practices address cable routing, dressing, bend radius, service loops, grommets/brush panels, tie-wrap use, terminal blocks, and patch bays. Termination quality is audited for solder, crimp, captive connectors, BNC integrity, and audio shield connections. Power distribution and testing ensure correct switched and unswitched feeds, conditioner use, outlet capacity, and successful power-up. Findings are recorded and escalated to the project manager.
by David Ross, from the CommunityDownloads: 100+Get - Template
OSB Remedial
This comprehensive audit documentation template provides a structured framework for recording and managing audit findings. The template includes essential fields for documenting audit details such as document numbers, site information, personnel involved, and fault categorization. It specifically focuses on technical audits involving duct work, tube systems, and FAT assessments, with dedicated sections for location tracking and remedial actions. The template also incorporates important elements like cause codes, trouble codes, and UN fault categories, ensuring thorough documentation of issues and their resolutions. Complete with provisions for photo documentation, claims processing, and approval tracking, this template serves as a professional tool for maintaining detailed audit records while following industry standards and best practices.
by munendra raj, from the CommunityDownloads: 100+Get - Template
Chorus QA - NGA Provisioning - Dec 2015
Template for field QA for Chorus NGA provisioning (NDF-159)
by Rosie Cree, from the CommunityDownloads: 100+Get - Template
Visionstream Visitor Site Induction Record
This Visionstream visitor site induction record helps teams brief visitors before entering operational sites. It covers site-specific hazards such as electrical works, excavations, RF/EME radiation, working at heights, and traffic, plus PPE and conditions of entry. It guides escorts through emergency procedures and logs visitor details and signatures to document compliance with safety requirements.
by Jem Bradbrook, from the CommunityDownloads: 100+Get - Template
DVN2 Wideband Photo Audit Template
This DVN2 Wideband Photo Audit template standardizes the photographs required after installing network equipment in exchanges, studios, or customer venues. Capture clear images showing rack and subrack placement, CIP/IP installation, power and earthing, HC-PDP setup, cabling routes, and labeling. Ensure compliance with design specs, correct termination, airflow, card replacement access, and proper identification. Use close-up photos to verify connections, cable management, CB utilization, and label readability. The compiled audit supports operations, technical support, and ongoing maintenance by providing a complete visual record.
by Paul McBurney, from the CommunityDownloads: 100+Get - Template
BRS NGA Scoping Form Version 1
Form to be completed on every NGA job and Attach to Fibre Jam and emailed to your Field Manager
by Steve O'Donoghue, from the CommunityDownloads: 100+Get - Template
Wideband Photo Audit - Wideband TX V1.4
This document is used to assist in conducting product audits using photographs of the completed works on site.
by Paul McBurney, from the CommunityDownloads: 100+Get - Template
Visionstream Pressure Testing Validation
Confirmation that Pressure Testing has been undertaken
by Mel Dawson, from the CommunityDownloads: 100+Get - Template
Chorus QA - MDU/ROW Build - Oct 2015
Template for Field QA for MDU/ROW build work (NDF-159 v2.8)
by Rosie Cree, from the CommunityDownloads: 90+Get - Template
NGA High Cost Approval Form (V3)
This NGA High Cost Approval Form (V3) is used to document and approve telecommunications network remediation work. It captures S/O number, address, dates, preparer, scope details, quotes, adherence to the NGA lead-in decision tree, photos and concept drawings, network and duct sizes, civil works inside and outside boundary, code claims, network changes, GPS coordinates, and site diagrams. It also records Chorus requirements, UN ticket numbers, exchange area and FFP numbers. On completion, submit to your field manager and the designated Chorus and Visionstream email addresses for review and approval.
by Steve O'Donoghue, from the CommunityDownloads: 90+Get - Template
Telstra Site Inspections (Large)
A detailed facility audit framework designed to assess and document the complete condition of commercial and industrial buildings. This comprehensive checklist covers essential areas including building structure, grounds maintenance, security features, utility systems, and safety equipment. The audit encompasses structural elements, fencing, roofing, electrical systems, fire safety equipment, mechanical systems like hoists and lifts, air conditioning units, and emergency power systems. Each component is evaluated using a 1-5 condition rating system, with photographic documentation requirements and specific attention to safety compliance and maintenance status. This systematic approach ensures thorough facility assessment and helps identify potential issues requiring attention.
by Andrew Clacher, from the CommunityDownloads: 90+Get - Template
Mastec Site Audit Checklist for NATE/OSHA
Comprehensive telecom site audit checklist for tower projects covering job site documentation, site conditions, PPE, fall protection, RF exposure, electrical and overhead hazards, cranes, hoists, personnel lifting, catheads, rigging, gin poles, trenching and excavating, heavy equipment, tools, ladders, vehicles, and DOT driver compliance. Includes results, time on site, corrective actions, and review sign-offs. Designed to support NATE/OSHA compliance.
by Cris Casteel, CHST, from the CommunityDownloads: 90+Get - Template
UCG Daily Site Diary
This UCG Daily Site Diary template helps telecom and cabling teams document daily works on site. Capture key project information such as MDU reference, address, company name, work date, preparer, location, and personnel. Record device details with pre-work checks, device reference, and open and closed photos. Attach comprehensive as built photos for devices and pathways, including pre-work and post-work images, to finalize the construction phase and maintain accurate records for compliance and handover.
by Steve Turner, from the CommunityDownloads: 90+Get - Template
Rop- 012 - Reporte Técnico - Versión 3 - Vigente Desde 26/01/2018
Control Diario De Servicio Técnicos
by Alvaro Javier Martinez Escalante, from the CommunityDownloads: 90+Get - Template
AV Field Audit Checklist
This AV Field Audit template helps evaluate on-site audio-visual service visits end to end. It covers ASC management practices, appointment handling, engineer training, ESD compliance, vehicle condition, ID and PPE, spare parts handling, pre-repair diagnosis, repair execution, and post-repair verification. It also captures customer feedback, documentation and sign-off, ensuring consistent quality across field service operations.
by Greg, from the CommunityDownloads: 90+Get - Template
Checklist de Visita en Campo para Claro Hogar
Este checklist de visita en campo para Claro Hogar está diseñado para supervisores y jefes de grupo que auditan actividades comerciales en terreno. Permite registrar información clave como producto, zona visitada y ubicación; verificar presencia del supervisor, uso de kit de ventas, grilla de canales, fraseología, registro y lugares de pago; controlar dotación y uniformes; documentar plan de trabajo (puertéo, volanteo, eventos) con fotos; listar recursos usados (volantes, megáfono, módulos, camioneta, toldo); y realizar observaciones, acuerdos y calificación con firma del supervisor FFVV.
by Gonzalo Maldonado, from the CommunityDownloads: 90+Get - Template
West 6 Cancellation Log v2.1
Please use this log to escalate any cancellations to your PO SE's and PO Managers
by Mike Crane, from the CommunityDownloads: 90+Get
