Categories
Telecommunications & Media
Discover easy-to-use Telecommunication & Media templates and training courses for distribution, compliance check, and more. Use them to gain practical knowledge, streamline your work, and stay on top of industry best practices. Customize these resources to fit your needs and excel in the Telecommunication & Media industry with confidence.
- Template
UFB Connect - MDU / ROW Checklist - 2
A detailed documentation framework for fiber installation projects covering all essential aspects of the installation process. The checklist encompasses surface preparation and excavation specifications, hardware installation requirements, testing protocols, and comprehensive photo documentation guidelines. It includes specific sections for different installation types (hard, soft, aerial, surface mount), detailed hardware installation verification, CVLS testing confirmation, and extensive photo documentation requirements for before, during, and after installation. The document ensures proper tracking of methodology changes, surface transitions, asset installations, and final reinstatement work. This systematic approach helps maintain quality control and provides a complete record of the installation process from start to finish.
by Felicia Poching, from the CommunityDownloads: 50+Get - Template
FTTH Civils Build Off Checklist
Use this FTTH civils build off template to capture photos and details of trenching depth, ducts, chambers or toby locations, MDU positions, upturns, and reinstatement. Record site info, job references, materials and measurements across soft, slabs, concrete, tar and galvanised surfaces, and attach evidence for compliance. Add notes, sign off details, and completion confirmation to verify quality before handover.
by Andy Holland, from the CommunityDownloads: 50+Get - Template
Chorus Quality - NGA Blitz
This document serves as a standardized template for recording and assessing service orders, specifically designed for NGA Blitz quality control processes. It provides a structured format for documenting essential information including service order numbers, site addresses, inspection dates, and quality assessments. The template includes sections for photo documentation requirements and quality observations found on site. While created by SafetyCulture's community of customers and employees, this template is intended as a reference guide only and should be adapted according to specific workplace requirements and jurisdictional regulations. Users are advised to seek professional guidance for implementation in their specific contexts.
by Tony Hall, from the CommunityDownloads: 50+Get - Template
Q Technical Feedback Form 2016
This template provides a structured format for documenting technical installations and troubleshooting of Q systems. It covers essential information including job numbers, engineer details, customer information, and technical specifications. The form guides technicians through important verification steps such as software versions, WiFi testing, and system diagnostics. It also includes sections for documenting problem-solving steps, equipment installations, and escalation procedures. This standardized approach ensures consistent documentation and proper follow-up for technical installations and service calls. The template helps maintain quality control and provides a clear record of all technical interventions and system improvements made during site visits.
by Paul Edwards, from the CommunityDownloads: 50+Get - Template
Post-Installation Checklist v1.5
The following checks are to be completed by the Installation Engineer prior to leaving site.
by Irtiza Mumtaz, from the CommunityDownloads: 50+Get - Template
Eclair Digital Dual Feed Upgrade 2017 Checklist
This field checklist guides engineers through the Eclair Digital dual-feed satellite upgrade. It covers pre-checks, dish location and access, required cabling, and relocation approvals. Step-by-step instructions outline installing the dual feed on coax or fiber systems, alignment to 1W and 5W with DiSEqC settings, and recording C/N, MER, and power at the receiver. It includes photo evidence requirements, commissioning parameters for DVB-S and DVB-S2, and client and engineer sign-off to confirm completion.
by Steve Jones, from the CommunityDownloads: 50+Get - Template
Telstra Network Site Inspection Checklist
This Telstra Network Site Inspection checklist supports facilities and network teams in assessing the integrity and safety of telecommunications sites. It guides inspections of site access, grounds, fencing, external lighting, buildings, towers, windows and doors, gutters, roofing, and signage. Internal checks cover emergency plans and sign-in, asbestos, lighting, toilets and plumbing. Electrical reviews include AC power, switchboards, GPOs, and DC power battery rooms. Life-safety systems span fire indication panels, VESDA, pumps, tanks, extinguishers, exits, and doors. Plant and equipment sections address hoists, lifts, emergency power plant and fuel storage, sump pumps, HVAC systems, cooling towers, compressed air, and project works. It also includes energy and waste management plus special site conditions.
by Rowan Williams, from the CommunityDownloads: 50+Get - Template
Checklist Obra Civil U1900 And Lte 1.1
E R D Edgar Ramirez Designs Producto Registrado By Ing. Edgar Alejandro Ramirez Martinez, Work In Telcel Solutions
by Edgar Ramirez, from the CommunityDownloads: 40+Get - Template
North 3 MDU Escalation Form v031218
This document provides detailed instructions for Sky field engineers handling Multiple Dwelling Unit (MDU) installations and support. It covers essential procedures including data logger testing in both standard and dSCR modes, access protocols for cabinet/switch/head end units, and proper escalation procedures. The guide emphasizes the importance of proper signal testing using SkyMaster meters, customer communication protocols, and the specific steps required for successful MDU installations. It includes detailed instructions for handling various scenarios, from successful installations to situations requiring escalation to team managers. The document also outlines important restrictions regarding equipment handling and customer expectation management, ensuring consistent service delivery across MDU installations.
by Andrew Dixon, from the CommunityDownloads: 40+Get - Template
NGA Fibre Ready Scoping Form (Version 5)
This NGA Fibre Ready Scoping Form (Version 5) supports Ultra-Fast Broadband provisioning. It captures job details (S/O number, address, commit date), scope type, and work type (aerial, haul, surface mount, trenching, drilling). Record network type, approvals, required skills, drill and trench distances, traffic management plans, and other requirements. Collect customer details, job instructions, labelled photos, and identify health, safety and environmental issues. Document consents (ROW, MDU, heritage), network elements (FAT, cabinet, ETP distance), internal materials, preferred ONT and RGW locations, and notes. Includes end user consent aligned with Chorus terms and guidance to use the Last Step Fibre template when applicable. Email completed form to the UFB provisioning mailbox.
by Harry Singh, from the CommunityDownloads: 40+Get - Template
DWDM Expansion Rack-CSD55162 v1
This detailed technical audit checklist covers the complete installation process of DWDM network equipment racks and associated infrastructure. The guide is divided into 14 key sections, including superstructure installation, safety rail requirements, rack expansion procedures, power distribution panel setup, optical fiber management, and earthing systems. Each section contains specific verification points to ensure compliance with technical standards and safety requirements. The document includes mandatory photo documentation requirements for quality assurance and verification purposes. This comprehensive guide helps installers and auditors maintain consistent installation standards across telecommunications facilities, with particular focus on DWDM equipment installation, power systems, fiber optic cabling, and safety compliance. The checklist ensures all critical aspects of the installation meet industry specifications and operational requirements.
by Edward Hu, from the CommunityDownloads: 40+Get - Template
FTTH CityFibre Build Walk Off Report SCCI V1.8
This FTTH CityFibre build walk off report (SCCI V1.8) is a comprehensive checklist for MDU fiber installations. Capture site details, job references and routing, confirm work against the approved job pack, and attach required photographs. Record access requirements, number of dwellings and floors, and comply with fire safety by documenting trunking, fire clips, penetrations and fire stopping; include FIRAS URN if applicable. Log distribution points (DPs), street cabinet or ASN, fibre connectivity, lead in locations, and light loss readings. Conclude with quality checks, incidents, subcontractor details and sign off.
by Andy Holland, from the CommunityDownloads: 40+Get
