Skip to content
SafetyCulture
Template

FTTH G Network Walk Off Report: Phase 1.5 and 2

by Adam Gilbert, from the Community

0
Get this template

This FTTH G Network build walk off report outlines the one stage approach for sites with or without PIA, detailing Phase 1 IOLM testing and Phase 1.5 and 2 procedures. It covers fitting splitters in the distribution point, splicing to bulkheads with patch leads, powering and testing one in eight circuits, communications cabinet split tray setup, and testing when BT circuits are not in place. It clarifies what is left ready for ITS or 4th Utility to patch and test once PIA is completed, with photo evidence requirements.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.