FTTH G Network Power Test Walk-Off Report V1.2
by Adam Gilbert, from the Community
This FTTH G Network walk-off report outlines Phase 1 IOLM and Phase 2 testing, plus Phase 1.5 when PIA is pending. It details fitting splitters at DPs, splicing to a bulkhead with patch leads, and power testing one in eight through splitters using a local generator. The guide covers preparing the comms cabinet, installing split trays, and testing local cabling when the BT circuit is not in place. Patch leads are left ready for ITS or 4th Utility to complete PIA, patching, and final verification. Photo evidence of comms cabinet and DP patching is required.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
