FTTH Phase 1.5/2 Power Test Walk-Off Report
by Nelio Goncalves, from the Community
This FTTH build walk-off report helps teams record Phase 1.5 and Phase 2 power testing for fiber deployments. Document IOLM Phase 1 results, local cabling checks, and splitter installation at distribution points, then power test to one in eight through splitters using a local generator where required. Capture comms cabinet setup, patch leads fitted at split panels, and photo evidence. Note where PIA is pending, and confirm responsibilities for final patching and second-stage testing. Complete all fields for a thorough handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
