Skip to content
SafetyCulture
Template

FTTH Phase 1.5/2 Power Test Walk-Off Report

by Nelio Goncalves, from the Community

Downloads: 20+
Get this template

This FTTH build walk-off report helps teams record Phase 1.5 and Phase 2 power testing for fiber deployments. Document IOLM Phase 1 results, local cabling checks, and splitter installation at distribution points, then power test to one in eight through splitters using a local generator where required. Capture comms cabinet setup, patch leads fitted at split panels, and photo evidence. Note where PIA is pending, and confirm responsibilities for final patching and second-stage testing. Complete all fields for a thorough handover.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.