FTTH - G Network - Build Walk Off Report - SCCI V1.4
by Nelio Goncalves, from the Community
This FTTH build walk-off report template helps teams document fibre-to-the-home network handover for G Network projects. Capture site information, access requirements, BFP (Building Fibre Demarcation Point) details, number and status of DPs, and a brief summary of works completed. Log IOLM test results for all flat fibres and perform a live power test on one property per splitter as per the job pack. Attach photographs of the BFP, DPs, and red line drawings, add notes, and complete a formal sign-off to confirm installation quality and completion.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
