Main Contractor Role for ATL on behalf of NCR v1.2
by Paul Walker, from the Community
This checklist supports main contractors delivering NCR projects on behalf of ATL. Capture pre-install photos, store information, permits (general and electrical), CSCS verification, on-site personnel, and detailed evidence of SCO and POS installation. Record lane numbers, branding, trunking, service poles, skirting, and verify flooring and ceiling works. Document relocations of mainbank or manned tills, attach annotated drawings, and add RAP cabinet/screen photos. Confirm operational status, resolve I.T. issues, and complete sign-offs for electricians, ATL, NCR, and store management to ensure fit-to-trade handover.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
