Use this main contractor checklist to manage ATL installations for NCR in retail stores. Capture pre-installation photos, verify site safety boards, complete ATL and electrical permits, and record on-site personnel and CSCS details. Document SCO and POS installations, including lane numbers, branding, trunking, service poles, RAP cabinets, and operational status. Assess flooring, ceiling, skirting, and any relocated mainbank or manned tills with annotated evidence. Finalize with permit sign-offs, engineer and contractor signatures, and store handover fit to trade.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
