Skip to content
SafetyCulture
Template

Main Contractor Role Checklist for ATL NCR v1.5

by Paul Walker, from the Community

Downloads: 0
Get this template

Use this main contractor checklist to manage ATL works completed on behalf of NCR during retail front-end refurbishments. The template guides teams through pre-installation evidence, site safety, permits, SCO and POS installation checks, trunking and service poles, mainbank and manned tills relocations, flooring and ceiling works, tannoy verification, and photographic documentation. Capture issues, extras, and snags, verify branding and IT readiness, and secure electrician and contractor sign-offs. Includes a future front end scope of works summary for store fit-out items, power and data, signage, and decorations.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.