This SCCI OTT roll out checklist guides field engineers through deploying in venue AV for OTT. Record site details, installed kit, and switch connections. Install and label HDMI leads, splitters, and adapters. Fit and label Amino set top boxes and a Netgear switch, capture asset numbers and photos for the rack, gantry, and screens. Replace SIS receivers with Cisco units, record UA and asset numbers, confirm authorization, and verify screens boot on the correct source after a power cycle. Remove legacy PCs, receivers, RF and modulation equipment as required and document any issues. Complete client and engineer sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
