Skip to content
SafetyCulture
Template

IRS Faceplate and 4 Fibre Report 1.2

by Nelio Goncalves, from the Community

Downloads: 20+

This IRS Faceplate and 4 Fibre Report template helps engineers record a complete installation. Capture job and site details, confirm fire stopping on both sides of entry points, and document socket installation in living areas. Log whether multiroom was added, include photos of connections, and run signal and functionality tests. Record equipment tested including Freeview, Freesat, Sky Plus, Sky Q, foreign receivers, and radio. Add photo evidence of the cable route, note if dishes were removed or returned, and blank off old sockets. Conclude with comments, resident satisfaction questions, and signature to confirm work completion.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.