Skip to content
SafetyCulture
Template

Void Handover Inspection Checklist

by Chris Greatorex, from the Community

Downloads: 10+
Get this template

Use this void handover inspection checklist to ensure a property is ready to let after void works. Record property address and date, verify safety certifications (electrical, gas CP12, EPC), check weather tightness and damp and mould, track keys, capture gas and electric meter readings and credit, confirm works completed to specification, cleanliness, and rubbish removal. Log defects with target dates, attach completion photos by room (external, kitchen, bathroom, WC, hallway, lounge, bedrooms), and complete sign-off to release the property for re-letting.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.