Skip to content
SafetyCulture
Template

Bailey 550 Building Rounds

by Cole 166 Sheldon, from the Community

0
Get this template

This building rounds template helps facilities teams document critical HVAC and plant operations across Bailey 550. Record chiller performance for units 1 and 2 including water temperatures, refrigerant pressures, compressor currents and voltages, and run time. Capture pump and condenser water statuses, suction and discharge pressures, and chilled water pump data. Log cooling tower conductivity, chemical feed settings, and post-bleed results. Enter garage electrical, makeup water, and blowdown meter readings. Check elevator machine room temperature and water source heat pump room pressures, plus strainer condition and cleaning. Track AHU status, supply and return air temperatures, and chilled water valve positions for multiple units. Conclude with a shift summary, note issues requiring service by UNT or contractors, and attach photos of equipment or damage.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.