This longhole drilling post-blast inspection checklist helps mining teams verify safety and readiness after a blast. Confirm vent and ground clearance, blast disconnection, barricades, lead wire removal, washing and scaling of the heading, and correct installation of required hardware. Check that all loaded holes were initiated, pre-loaded holes are visible and signed, no remnant powder or cord remains, and whether blow piping is needed. Ensure smart shot boxes are returned and on charge, note any rehabilitation or further work required, and record sign-offs from supervisors to prepare for the next blast.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
