This longhole drilling post-blast inspection checklist helps mining teams verify safety and readiness after a blast. Confirm vent and ground clearance, blast disconnection, barricades, lead wire removal, washing and scaling of the heading, and correct installation of required hardware. Check that all loaded holes were initiated, pre-loaded holes are visible and signed, no remnant powder or cord remains, and whether blow piping is needed. Ensure smart shot boxes are returned and on charge, note any rehabilitation or further work required, and record sign-offs from supervisors to prepare for the next blast.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
