Skip to content
SafetyCulture
Template

Shot Blast and Paint Shop 6-Month Maintenance

by Stephen Renaghan, from the Community

Downloads: 0

This 6-month maintenance checklist for shot blast and paint shop operations guides teams through essential preventive tasks. It covers changing spray booth ceiling filters, replacing plastic wall covers, renewing floorboards in multiple booths, and servicing shot blast dust extraction filters. Use it to schedule maintenance, document locations, dates, and responsible personnel, and capture any issues for follow-up to reduce downtime and maintain finish quality and compliance.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.