Skip to content
SafetyCulture
Template

D2 Process 5S Inspection Checklist

by garth barratt, from the Community

0
Get this template

Use this D2 Process 5S inspection audit for Day 7 to assess dryer process areas across all levels and rooms, including evaporator decks, air heater room, MVR deck, storeroom, homogeniser, concentrate tanks and filters, vitamin room, airlock, and MCC. Check hoses and drain covers, pooling water or condensate, foreign material risks, tool and equipment condition, building integrity, pest activity and trap counts, brush storage, general cleanliness, doors, and CIP stands. Capture photos, note corrective actions, and complete sign off with the team leader and process manager.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.