Solar PV Completion of Works Installer Report
by Dan Wolstenholme, from the Community
Use this completion report to document all aspects of a solar PV and battery storage installation. Capture pre, mid, and post install photos of the array, rail and hooks, inverter, and wiring. Record inverter serial numbers and operating screens for PV1 and PV2 voltages, datalogger serials, battery serials and stack photos, meter and CT clamp positions, and breaker ratings. Include Zappi, Eddi, and Harvi device details, minor works with essential electrical test results to BS 7671, and attach EIC reports. Conclude with customer satisfaction comments and signatures from both customer and installer.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
