Use this solar installation report to document electrical work before and after installation. Record customer details, locations, and serial numbers. Follow the inverter checklist including DIP switch settings, BMS cabling, CT clamp orientation, and data wiring between grid meter, inverter, and battery. Capture AC and DC cable runs, inverter and battery photos, isolators, hazard labels, and commissioning screenshots. Log consumer unit details, test results (Zs, Ze, PFC, insulation resistance), and confirm BS7671 and MCS compliance. Provide handover documents and customer sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
