Solar Installation Report Electrical V9 Checklist
by Bilal Islam, from the Community
This electrical V9 solar installation report guides installers through end to end PV and battery setup. It covers inverter and battery wiring, grid meter and CT clamp connections, DIP switch configuration, LoRa and WiFi commissioning, and safety clearances. Capture DC and AC run details with photos, apply labels and hazard stickers, and document consumer unit work. Include test results such as Zs, Ze, PFC, and insulation resistance. Complete declarations to confirm compliance with BS7671 and MCS guidelines, verify stickers and seals, and walk the customer through isolation points, reset steps, and app usage before sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
