Capture every stage of solar PV and electrical works with this V6 installation report. Record client and property details, pre-works risk assessments, PPE checks, scaffolding verification, and in-progress photos. Document AC and DC installation details, meter readings, inverter specs, test results, and BS 7671 compliance. Include customer sign off, completion notes, and a summary of system size and panels.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
