This field checklist guides the installation of PE pressure sewer pipe using horizontal directional drilling. It covers onsite documentation and permits, daily plant checks, material specs (PN16, SDR11, PE100), service locating and minimum clearances to WSA standards, traffic management and environmental controls, drill rig setup within the construction impact zone, pipe laying requirements including minimum cover and tracer wire, drilling fluid management with HydroVac, reaming and pullback practices, and verification, testing, and sign-off. Designed to support safe, compliant water and wastewater sewer works.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
