Use this checklist to guide pressure testing of gravity sewer pipelines on civil works and utility projects. It captures project and drawing details, references WSA and council specifications, and supports common pipe materials including PVC, GRP, polyethylene, ductile iron, and concrete. Enter pipeline diameters and lengths, apply initial and test pressures, and hold for specified times to assess allowable pressure loss. The workflow covers site setup, barricading, traffic control, SWMS, confined space entry, equipment checks, plug installation, pressurization, result recording, and demobilization. Document gauge numbers, inspector remarks, photos, and approval.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
