This checklist supports vacuum testing of sewer pipelines in line with WSA06-2008-1.2, Clause 41.4.4. Capture project details, materials (uPVC, GRP, DI, MSCL, RC, PE), pipeline diameters and lengths, and test parameters including initial vacuum pressure of -80 kPa, 3-minute settle time, 3-hour hold time, and allowable 3 kPa loss. Follow steps for site setup, barricading, traffic control, and confined space procedures. Verify equipment, stabilize vacuum, hold and record results, add photos and remarks, and document approvals to demonstrate compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.