This checklist supports vacuum testing of sewer pipelines in line with WSA06-2008-1.2, Clause 41.4.4. Capture project details, materials (uPVC, GRP, DI, MSCL, RC, PE), pipeline diameters and lengths, and test parameters including initial vacuum pressure of -80 kPa, 3-minute settle time, 3-hour hold time, and allowable 3 kPa loss. Follow steps for site setup, barricading, traffic control, and confined space procedures. Verify equipment, stabilize vacuum, hold and record results, add photos and remarks, and document approvals to demonstrate compliance.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.