Skip to content
SafetyCulture
Template

Sewer Works Site Inspection Checklist (MRWA)

by James Sorraghan, from the Community

Downloads: 10+
Get this template

This MRWA ready sewer works site inspection checklist helps contractors and inspectors verify compliance across every stage of sewer construction. Capture site details, PPE and TMP checks, materials approvals, trenching and boring controls, pipe installation and jointing, bedding and haunching, property branches, and backfilling. Cover inspection shafts, maintenance holes, concrete works, covers and drops, and live works with permits, gas detection, and confined space gear. Attach photos, note defects and corrective actions, and document restoration of pavements and grassed areas.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.