Skip to content
SafetyCulture
Template

Water and Sewer General Inspection Record

by Lyndon Hockey, from the Community

Downloads: 10+
Get this template

Use this general inspection record to document water and sewer works across development phases, including pre-start, construction, pre-connection, live connection, practical completion, and maintenance. Capture details on meters, hydrants, valves, manholes, sewer mains, CCTV results, approvals, GIS references, and SEQ Code compliance. Record safety, environmental and community concerns, traffic management, permits, SWMS, ITPs, and redlined drawings. Attach notes and photos, verify markers and road markings, and log final results and signatures for both the contractor and Development Services inspector.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.