Use this WW DS General Inspection Record to plan and document inspections for water and sewer works on development sites. Capture site details, inspection type, compliance with approvals and SEQ Code requirements. Record checks for hydrants, valves, water meters, sewer mains, manholes, CCTV results, and road and kerb markings. Log safety, environmental and community notes, permits, ITP witness points, and variations, with photos and final outcomes. Designed for local government and contractors overseeing pre start, construction, pre connection, live connection, and maintenance stages.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
