Live mains insertion on low pressure mains up to 180mm
by Alan Milford, from the Community
This procedural template outlines the method for live mains insertion on low pressure gas distribution mains up to 180 millimeters. It covers required tools and equipment, site preparation, safety checks, bypass installation and commissioning, flow stopping, pressure testing, purging, and controlled insertion using approved pushing machines. The guidance explains completion steps including foaming the annulus where required, squeeze off, joint testing, reinstatement, and documentation. It also details service transfer sequencing, decommissioning of the host main, and recovery of the live head, with emphasis on maintaining supply continuity, verifying gas isolation, and following manufacturer instructions and internal work standards. Designed for field operatives and assessors, this guide supports consistent, safe utility operations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.