Skip to content
SafetyCulture
Template

Live mains insertion on low pressure mains up to 180mm

by Alan Milford, from the Community

Downloads: 0

This procedural template outlines the method for live mains insertion on low pressure gas distribution mains up to 180 millimeters. It covers required tools and equipment, site preparation, safety checks, bypass installation and commissioning, flow stopping, pressure testing, purging, and controlled insertion using approved pushing machines. The guidance explains completion steps including foaming the annulus where required, squeeze off, joint testing, reinstatement, and documentation. It also details service transfer sequencing, decommissioning of the host main, and recovery of the live head, with emphasis on maintaining supply continuity, verifying gas isolation, and following manufacturer instructions and internal work standards. Designed for field operatives and assessors, this guide supports consistent, safe utility operations.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.