Use this DN-10 Dead Service Insertion checklist to assess competency and document each step of replacing a steel gas service by dead insertion. It covers site checks for corrosion, excavation and decommissioning, purging to 0% gas in air, ECV removal and standpipe inspection, measuring service length and gas load, calculating PE diameter and pressure drop, clearing debris, safe insertion and communication, visual checks for kinks and scoring limits over 10%, fitting the service head adaptor and IECV, connection to the main, pressure testing, commissioning and purging in line with SGN procedures, sealing and annulus filling, applying electrical insulation, and completing the service information label.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.